Step 3
Step 4
Step 3:
Secure poles (K) to the top support frames
using screws (AA). Then use the screws
(BB) to secure the cross poles (I) with top
pole (E).
Step 4:
Insert the sling tube (L) in the small roof
canopy (Q). Then use the screws (AA) to
connect the roof canopy with the top
support poles. Insert 2 or 3 screws on each
side before securing the rest of the
screws. Step ladders will be required to
safely complete this step.
5