7
ASSEMBLY
AND
ZERO
-
SETTING
OF
INDICATOR
2
9. Manually screw the ring nut “C” until its stopped, trying to maintain the zero-setting.
Firmly apply the 13mm A/F wrench to threaded connection “E”, and then lock the
ring nut “C” by means of the 16mm A/F wrench (see fig. 7).
10. Re-assemble the two semi-clamps to the relevant cable holder seats, inserting in-
between the cable (*) (see fig. 8).
11. Replace and screw the 2 nuts in the cable clamp, and lock them using the 4mm A/
F wrench (see fig. 8).
12. Screw the handle to the measuring unit (see fig. 9), and lock it by means of the
13mm A/F wrench.
13. Perform the electrical zero-setting of the bore gauge through the electronic system
in use.
(*) The pencil probes for the M1 Star (see page 53) have been manufactured with a 4,7
mm diameter cable. In case the pencil probes in use have standard diameter cables
(3,3 or 3,8 mm), it is required to use the specific tear-resistant gaiter included. Please
refer to fig. 8 for assembling.
NOTE
:
The removal and/or replacement of the plug gauge may result in the loss of the zero-
setting of the bore gauge..
13 A/F
Summary of Contents for M1 Star MBG
Page 2: ......
Page 56: ...56 7 LIST OF SPARE PARTS NOTES NOTES ...