DC Electric Systems
7.10
vidual light components (see also the Boating Safety
chapter of this manual for additional information on navi-
gational lighting):
Running lights - the standard starboard (green), port
(red) lights and stern (white) lights located on the
deck
Anchor light - the 360 degree light located on the top
of the mast
Steaming light - the 225 degree light located on the
the top of the mast under the anchor light.
A 5 amp switch breaker provides power to the running
lights. It is labeled “RUNNING LIGHTS” on the panel and
protects this system from a power fault.
Control of the anchor light and steaming light is through
a vertical 3-position toggle switch. Setting the switch in
the up position will illuminate the anchor light; middle
position is off; down position will illuminate the steaming
light. When either light is illuminated, an LED light on
the toggle switch will illuminate to indicate an energized
system. A 5 amp pop-out breaker located to the left of
the toggle switch protects the anchor light/steaming light
circuitry from a power fault.
The nav light configuration will depend on the status of
the boat at night:
Anchored - anchor light only
Under sail - running lights and steaming light
Under power - running lights and anchor light
7.3.2.2.2 Boat Based Visibility Lighting - Cockpit
and Cabin Lights Breaker
Cabin lights, cockpit storage light and optional arch
speaker pod light are all energized once the DC panel
is energized. A 20 amp reset breaker labeled “CABIN
LIGHTS” protect these circuites from a power fault.
Individual wall or fixture switches allow lights ON/OFF.
One single switch wall light plate (left plate Fig. 7.17)
exists in the galley and is located on the upper cabinet
lower face. The switch controls the dish rack mini light
located within the upper galley cabinet.
The balance of the interior light fixtures (also cockpit stor-
age and optional arch speaker pod light) have ON/OFF
switches on the fixture. Refer to Figure 7.20 for light
fixture location and details.
1.
2.
3.
1.
2.
3.
Figure 7.17
7.3.2.3 Fresh Water Pump Breaker
This 10 amp switch breaker controls power to the fresh
water pump. It is labeled “WATER PUMP” on the DC
Panel and protects it from a power fault. The water pump
pressurizes the fresh water system (refer to the Water
Systems chapter in this manual for additional details).
NOTE: Consult the pump manufacturers’ OEM manual for
pump operation, care and maintenance.
7.3.2.4 GPS/Chartplotter Switch/Breaker
This 10 amp switch breaker controls power to the optional
chartplotter ( wide-screen display). It is labeled “GPS” on
the panel and protects the chartplotter from a power fault.
The GPS is generally bundled with the chartplotter (with
or without radar).
NOTE: Consult the chartplotter manufacturers’ OEM manual
for instrument operation, care and maintenance.
7.3.2.5 Autopilot/Instruments Switch/Breaker
This 5 amp switch breaker controls power to the standard
knot/depth display and/or the optional Autopilot compo-
nent and protects them from a power fault. It is labeled
“INSTRUMENTS” for only the knot/depth display and
“AUTOPILOT” for the optional autopilot and knot/depth
display (unless the optional chartplotter is installed).
NOTE: Consult the instrument manufacturers’ OEM manual for
instrument operation, care and maintenance.
7.3.2.6 Panel Lights Switch
Half way down the right side of the panel is the two-posi-
tion toggle switch (“ON-OFF”) for panel lights. The power
for the panel backlights for both the DC panel and AC
Summary of Contents for MH31
Page 1: ...31 31 H V1 R01_121514 Operator s Manual U N T E R M A R L O W MH31 MARLOW HUNTER LLC...
Page 2: ......
Page 11: ...Introduction Chapter 1 MH31 MARLOW HUNTER LLC V1 R01_121514...
Page 12: ...Introduction i This Page Intentionally Left Blank...
Page 17: ...Introduction 1 5 Notes...
Page 18: ...Introduction 1 6 Notes...
Page 19: ...Documents Forms Chapter 2 MH31 MARLOW HUNTER LLC and V1 R01_121514...
Page 20: ...Documents and Forms This Page Intentionally Left Blank i...
Page 31: ...Documents and Forms 2 11 Float Plan 1 1 Figure 2 4...
Page 44: ...Documents and Forms 2 24 Power Squadron recommendations for maintenance and safe boating...
Page 46: ...Documents and Forms 2 26 Dates of practice drills and onboard safety inspections...
Page 47: ...Documents and Forms My personal preferences for maintenance items safety gear 2 27...
Page 48: ...Documents and Forms 2 28 Notes...
Page 49: ...Limited Warranty Chapter 3 MH31 MARLOW HUNTER LLC V1 R01_121514...
Page 50: ...This Page Intentionally Left Blank Limited Warranty 3 2...
Page 64: ...Limited Warranty 3 16 Notes...
Page 65: ...Boating Safety Chapter 4 MH31 MARLOW HUNTER LLC V1 R01_121514...
Page 66: ...Boating Safety i This Page Intentionally Left Blank...
Page 86: ...Boating Safety 4 20 MH31 DECK HARDWARE LAYOUT Figure 4 9...
Page 89: ...Boating Safety 4 23 Notes...
Page 90: ...Boating Safety 4 24 Notes...
Page 91: ...Fuel Systems Chapter 5 MH31 MARLOW HUNTER LLC V1 R01_121514...
Page 92: ...This Page Intentionally Left Blank Fuel Systems i...
Page 102: ...Figure 5 11 FUEL SYSTEM LAYOUT WITH OPTIONAL GENERATOR Fuel Systems 5 10...
Page 103: ...LPG SYSTEM LAYOUT Figure 5 12 Fuel Systems 5 11...
Page 104: ...Notes Fuel Systems 5 12...
Page 105: ...MH31 Underwater Gear Chapter 6 V1 R01_121514 MARLOW HUNTER LLC...
Page 106: ...Underwater Gear i This Page Intentionally Left Blank...
Page 113: ...Underwater Gear 6 7 Figure 6 15 Figure 6 16...
Page 115: ...Underwater Gear 6 9 INTAKES DISCHARGES BELOW WATERLINE Figure 6 17...
Page 117: ...Underwater Gear 6 11 Notes...
Page 118: ...Underwater Gear 6 12 Notes...
Page 119: ...DC Electric System Chapter 7 MH31 MARLOW HUNTER LLC V1 R01_121514...
Page 120: ...DC Electric Systems i This Page Intentionally Left Blank...
Page 137: ...DC Electric Systems 7 17 DC OUTLET LAYOUT Figure 7 21...
Page 138: ...DC Electric Systems 7 18 Notes...
Page 139: ...MARLOW HUNTER LLC MH31 AC Electric System Chapter 8 V1 R01_121514...
Page 140: ...AC Electric Systems i This Page Intentionally Left Blank...
Page 153: ...AC Electric Systems 8 13 AC SYSTEM MAJOR COMPONENT GENERAL LAYOUT WITH INVERTER Figure 8 18...
Page 155: ...AC Electric Systems 8 15 AIR CONDITIONER DUCTING LAYOUT Figure 8 20...
Page 156: ...AC Electric Systems 8 16 Notes...
Page 157: ...MARLOW HUNTER LLC MH31 Water Systems Chapter 9 V1 R01_121514...
Page 158: ...Water Systems i This Page Intentionally Left Blank...
Page 166: ...Water Systems 9 8 FRESH WATER LAYOUT Figure 9 14...
Page 168: ...Water Systems 9 10 STANDARD TOILET AND OPTIONAL AIR CONDITIONING RAW WATER LAYOUT Figure 9 15...
Page 169: ...Water Systems 9 11 Notes...
Page 170: ...Water Systems 9 12 Notes...
Page 171: ...Waste Systems Chapter 10 MH31 MARLOW HUNTER LLC V1 R01_121514...
Page 172: ...Waste and Sanitation Systems i This Page Intentionally Left Blank...
Page 181: ...Waste and Sanitation Systems 10 9 BILGE SUMP PUMP DRAIN SYSTEM LAYOUT Figure 10 17...
Page 183: ...Waste and Sanitation Systems 10 11 BLACK WATER ENGINE COMPARTMENT BLOWER LAYOUT Figure 10 20...
Page 184: ...Waste and Sanitation Systems 10 12 Notes...
Page 185: ...MH31 Engines Transmissions Chapter 11 MARLOW HUNTER LLC and V1 R01_121514...
Page 186: ...Engines and Transmissions i This Page Intentionally Left Blank...
Page 188: ...Engines and Transmissions 11 2 Engines and Transmissions 11 2 Figure 11 2...
Page 189: ...Engines and Transmissions 11 3 Figure 11 4...
Page 197: ...Engines and Transmissions 11 11 Notes...
Page 198: ...Engines and Transmissions 11 12 Notes...
Page 199: ...and V1 R01_121514 MARLOW HUNTER LLC MH31 Sails Rigging Chapter 12...
Page 200: ...Sails and Rigging i This Page Intentionally Left Blank...
Page 214: ...Sails and Rigging 12 14 Figure 12 14 GENERAL RIG COMPONENTS...
Page 215: ...Sails and Rigging 12 15 MAINSAIL JIB SPECIFICATIONS Figure 12 15...
Page 220: ...Sails and Rigging 12 20 Figure 12 21 MAINSHEET BOOM OUTHAUL LAYOUT...
Page 222: ...Sails and Rigging 12 22 VANG LAYOUT CONVENTIONAL SOLID Figure 12 23...
Page 224: ...Sails and Rigging 12 24 Figure 12 25 SPINNAKER LAYOUT OPTION...
Page 225: ...Sails and Rigging 12 25 Figure 12 26 GENERALIZED REEFING LAYOUT...
Page 226: ...Sails and Rigging 12 26 LAZY JACK LAYOUT WITH OPTIONAL STACK PACK SAIL COVER Figure 12 27...
Page 227: ...Sails and Rigging 12 27 STACK PACK SAIL COVER INSTALLATION WITH LAZY JACKS Figure 12 28...
Page 228: ...Sails and Rigging 12 28 Notes...
Page 229: ...MH31 Getting Underway Chapter 13 MARLOW HUNTER LLC V1 R01_121514...
Page 230: ...Getting Underway i This Page Intentionally Left Blank...
Page 236: ...Getting Underway 13 6 Notes...
Page 237: ...MH31 Maintenance Chapter 14 MARLOW HUNTER LLC V1 R01_121514...
Page 238: ...Maintenance i This Page Intentionally Left Blank...
Page 253: ...Maintenance 14 15 SLING LOCATIONS Figure 14 3...
Page 254: ...Maintenance 14 16 Notes...
Page 255: ...Glossary Chapter 15 MH31 MARLOW HUNTER LLC V1 R01_121514...
Page 256: ...Glossary i This Page Intentionally Left Blank...