
DAILY OPERATING, SHUT-DOWN
&
CLEANING INSTRUCTIONS
First check to be sure that:
A. WATER and HEAT switches are in the OFF position.
B. WATER supply valve is OPEN.
C. ELECTRICITY is connected to ALL units.
D. STEAM is turned on.
E. Proceed with daily operating procedure.
DAILY OPERATING PROCEDURE
STEP 1 Close STEAM GENERATOR DRAIN VALVE.
STEP 2 Flip WATER switch from OFF to ON.
STEP 3 Wait 6 minutes for water to fill in steam generator. (Gauge glass should be 2/3 full.)
STEP 4 Flip WATER switch from ON to OFF and back to ON immediately.
Indicator light will come on. (This is necessary to manually reset the unit.)
STEP 5 Flip HEAT switch from OFF to ON. This turns on HEAT.
DAILY SHUT-DOWN AND CLEANING
STEP 1 Flip HEAT and WATER switches to OFF. (Indicator light will go out.)
STEP 2 Open steam generator drain valve, and drain completely.
STEP 3 Repeat Steps 1 & 2 of DAILY OPERATING PROCEDURE, (Water to
remain in steam generator until next daily use.)
STEP 4 For shutdown for extended periods steam, generator must be cleaned and drained
completely. Refer to steam generator cleaning instructions for modular steam
generators S-2299 for complete instructions.
CAUTION:
BE SURE TO READ
Keep this appliance area free and clear from combustibles .
Do not obstruct the flow of ventilation air.
Keep this manual for future reference.
Contact the factory, the factory representative, or a local service company to perform maintenance and repairs.
In the event of a power failure, attempt should not be made to operate the appliance during power failure. Be sure water
switch is in the down position.