Control Panel
OPERATING INSTRUCTIONS
MODELS:
m
M24E18A
m
M24E24A
m
M24E32A
m
M24E36A
m
M24E42A
m
M24E48A
m
M36E18A
m
M36E24A
m
M36E32A
m
M36E36A
m
M36E42A
m
M36E48A
Page 3
OPERATING INSTRUCTIONS
STEAM GENERATOR
m
FIRST CHECK TO BE SURE THAT:
A. W ATER SWITCH IS IN THE OFF POSITION.
B. W ATER SUPPLY VALVE IS OPEN.
C. ELECTRICITY IS CONNECTED TO ALL UNITS.
D. THAT THE GAS IS TURNED ON. (GAS OPERATED UNITS ONLY)
E. THEN PROCEED WITH DAILY OPERATING PROCEDURES.
DAILY OPERATING PROCEDURE
STEP 1 PRESS WATER SWITCH FROM OFF TO ON.
STEP 2 WAIT 5-10 MINUTES FOR WATER TO FILL IN STEAM GENERATOR
(GAUGE GLASS SHOULD BE 2/3 FULL.)
STEP 3 PRESS HEAT SWITCH FROM ON TO OFF AND RELEASE BACK TO ON
WHEN THE LOW WATER LIGHT GOES OFF. GREEN INDICATOR LIGHT
WILL COME ON. (THIS IS NECESSARY TO MANUALLY RESET THE UNIT.)
DAILY SHUT DOWN AND CLEANING
STEP 1 PRESS WATER SWITCH OFF. THIS WILL DRAIN THE STEAM GENERATOR.
STEP 2 AFTER STEAM GENERATOR HAS COMPLETELY DRAINED REPEAT
STEPS 1 & 2 OF DAIL Y OPERATING PROCEDURE.
(WATER TO REMAIN IN STEAM GENERATOR UNTIL NEXT DAILY USE.)