Mark TANNER CLA Technical Manual Download Page 12

MARK BV
BENEDEN VERLAAT 87-89
VEENDAM (NEDERLAND)
POSTBUS 13, 9640 AA VEENDAM
TE31(0)598 656600
FAX +31 (0)598 624584
[email protected]
www.mark.nl

MARK EIRE BV
COOLEA, MACROOM
CO. CORK 
P12 W660  (IRELAND)
PHONE +353 (0)26 45334
FAX +353 (0)26 45383
[email protected]
www.markeire.com 

MARK BELGIUM b.v.b.a.
ENERGIELAAN 12
2950 KAPELLEN 
(BELGIË/BELGIQUE)
TE32 (0)3 6669254
[email protected]
www.markbelgium.be 

MARK DEUTSCHLAND GmbH

MAX-PLANCK-STRASSE 16
46446 EMMERICH AM RHEIN 
(DEUTSCHLAND)
T49 (0)2822 97728-0 
T49 (0)2822 97728-10
[email protected]
www.mark.de

MARK POLSKA Sp. z o.o
UL. JASNOGÓRSKA 27
42-202 CZĘSTOCHOWA  (POLSKA)                                                                     
PHONE +48 34 3683443 
FAX +48 34 3683553 
[email protected]
www.markpolska.pl

S.C. MARK ROMANIA S.R.L.
STR. KOS KAROLY NR. 1 A
540297 TARGU MURES 
(ROMANIA)
TEL/FAX +40 (0)265-266.332
[email protected]
www.markromania.ro

CERTIFICATION N°: 17.07.011 

AIRSTREAM

CERTIFICATION N°: 17.07.011 

AIRSTREAM

CERTIFICATION N°: 17.07.011 

AIRSTREAM

CERTIFICATION N°: 17.07.011 

AIRSTREAM

Summary of Contents for TANNER CLA

Page 1: ...EN 1 Technical manual TANNER CLA 0662560 ...

Page 2: ...ternal parts of the unit Do not install or use damaged devices In case of malfunction switch off the unit unplug the power supply and turn to the seller or qualified specialists Eliminate packaging material following the environmental regulations UNIT ACCEPTANCE HANDLING AND STORAGE At the time of the delivery verify the correspondence between the order and the indication of the delivery note Veri...

Page 3: ...pressure 10bar Minimum room temperature 4ºC UNIT DESCRIPTION AND DIMENSION OPERATING LIMITS 1 Frontal panel 2 Hydraulic connections 3 Condensate drain Ø16 4 Power supply wires input 5 Fresh air Ø60 mm 6 Distribution air Ø150 mm TYPE 150 154 TYPE 150 154 TYPE 070 090 094 TYPE 070 090 094 ...

Page 4: ...ydraulic The machine must be fixed to the ceiling by the means of threaded rods with anchors adjusted according to the type of structure to be provided by others as described the 4 hole positions in the structural ceiling must first be marked and the holes for the threaded rods must then be drilled the dimensions are show by fig A the threaded rods must be securely fixed in the ceiling their lengh...

Page 5: ...ct for an adjacent room FRESH AIR Remove the film on the sheet indicated with letter A in Fig D Use the flange Ø60 mm optional and connect the pipe with anti condensate insulation the use of a fan for the duct optional must be provided with non return valve and filter to prevent dust REMOTE AIR DISTRIBUTION Remove the film on the sheet indicated with letter B in Fig D Use the flange Ø150 mm option...

Page 6: ...le the one for the 4 pipes cassette is reported in fig F CONDENSATE DRAIN CONNECTIONS For its proper functioning it is recommended to fix the condensate drain duct with a minimum slope of 2 cm m Remember also that the maximum head of the pump is of 100 cm from the bottom edge of the unit Fig G Any condensate loss because of an incorrect connection of the drain is not attributable to the manufactur...

Page 7: ...collects the condensate formed near the water connections and the valves Fix the tray to the structure with the screws provided in the position shown in Fig H making sure pipes and insulation do not tilt it hindering the drain TYPE 150 154 TYPE 150 154 TYPE 070 090 094 TYPE 070 090 094 Fig H Fig H Fig I Connect respecting the instructions given in the scheme attached according to the unit typology...

Page 8: ... season change using a vacuum cleaner or brushing it To perform this operation follow the steps below With the help of a flat blade screwdriver rotate of 90º the locks placed on the intake grid of the front panel as shown in Fig L remove the filter from the inner rails being careful not to break them as shown in Fig M Once cleaned re insert the filter into the guide and close the grid by turning t...

Page 9: ... the water pipes tighten the water attacks fix the unit perfectly horizontally clean the dip tray check and clean the pipe of the condensate drain monitor the proper functioning of the condensate drain pump check the slope of the condensate collection tray THE UNIT DOES NOT COOL HEAT CORRECTIVE ACTIONS lower raise the set temperature on the thermostat check that the chiller boiler and circulation ...

Page 10: ...10 ELECTRICAL DIAGRAMS ...

Page 11: ...EN 11 ...

Page 12: ...rkbelgium be MARK DEUTSCHLAND GmbH MAX PLANCK STRASSE 16 46446 EMMERICH AM RHEIN DEUTSCHLAND TELEFON 49 0 2822 97728 0 TELEFAX 49 0 2822 97728 10 info mark de www mark de MARK POLSKA Sp z o o UL JASNOGÓRSKA 27 42 202 CZĘSTOCHOWA POLSKA PHONE 48 34 3683443 FAX 48 34 3683553 info markpolska pl www markpolska pl S C MARK ROMANIA S R L STR KOS KAROLY NR 1 A 540297 TARGU MURES ROMANIA TEL FAX 40 0 265 ...

Reviews: