
27
Installation Instalacja
1.5
1.5.1
1.5.2.1
1.5.2.2
1.5.2.3
1.5.2.4
Installation
Upon delivery check if all the parts are present
and take note of any damage. Check that you have recei-
ved the right model.
General
When installing the radiant heaters the applicable
regulations (from the gas company or the building code)
should be observed. Take particular note of
the latest version of the gas installation regulations.
A radiant heater may only be installed in a suitable room
and at the suitable location!
Air intake and flue gas discharge course
This combined duct must have a minimum resistance, so
it should contain as few bends as possible.
The diameter is the same across the entire track.
The duct must not be supported on the heater, but must
be suspended effectively (See also 1.4.9).
The flue gas system C12 must be installed from the
unit with a minimum slope of 3º. Follow the bracket
instructions of 1.9
Black bulb sensor/Room thermostat
For an optimum adjustment the sensor/thermostat
should be placed in “view” of the heater, at a height
of approx. 1.5 metres from the floor.
Gas supply and connection
The heater should be attached to the 1” gas inlet
pipe. An approved gas stop cock must be attached
within easy reach of the burner section.
Summary of Contents for Infra Line G20
Page 2: ...A C B 2 1 1 1 1 1 1 1 3 1 1 2 A B C ...
Page 4: ...4 1 1 1 1 4 1 1 5 A B G A B C D E F ...
Page 6: ...6 1 1 1 1 6 1 1 7 1 1 8 A B C A B C A B D ...
Page 10: ...1 3 10 1 3 1 07 1054 07 1056 ...
Page 12: ...1 4 12 1 4 1 1 4 2 1 4 3 1 4 3 3000 07 1058 07 1060 07 1059 07 1057 ...
Page 18: ...1 4 18 1 4 9 07 1102 07 1063 ...
Page 24: ...24 1 4 11 1 4 1 4 14 1 4 13 1 4 12 Reglung Zwei stufig 07 1078 07 1077 07 1080 07 1080 ...
Page 26: ...26 1 5 3060 ...
Page 28: ...28 1 5 1 5 3 1 5 3 1 1 5 3 2 07 1047 07 1048 07 1049 ...
Page 30: ...1 5 30 1 5 5 1 5 6 1 5 4 1A 2A max 4m 3A 1 2 3 07 1065 07 1052 07 1066 ...
Page 32: ...1 5 32 1 5 7 1 5 8 07 1068 07 1068 ...
Page 34: ...1 5 34 1 5 9 07 1064 07 1064 2 ...
Page 36: ...1 5 36 1 5 10 07 1069 A B ...
Page 38: ...38 1 6 1 1 6 2 1 6 3 1 6 ...
Page 40: ...40 1 6 1 6 4 07 1099 07 1100 A B ...
Page 42: ...1 6 42 ...
Page 43: ...43 Operation 1 6 Trouble shooting diagramm Infra Line On Off ...
Page 46: ...1 6 46 1 6 6 1 6 7 1 6 8 ...
Page 48: ...48 1 7 1 7 1 1 7 2 A D C B 07 1070 07 1031 30 22 215 B A C 20 140 3 30 22 330 30 22 417 ...
Page 50: ...50 1 8 1 8 3a 1 8 2 A 06 15 044 06 15 027 06 25 050 07 1071 07 1072 1 8 1 06 07 604 06 1221 ...
Page 52: ...52 1 8 1 8 3 b ...
Page 56: ...1 8 56 1 8 7 06 21 849 07 1084 A C B G D F E 06 31 290 ...
Page 58: ...1 9 58 07 1101 ...