8
Page 1: ...ition determine the available capacity of the greensmower The operator should check and control the greensmower during work to prevent overloading MAREDO DOES NOT TAKE ANY LIABILITY FOR GREENSMOWER DA...
Page 2: ...loves tie up long hair and use protection glasses for the eyes 7 Never overload the MAREDO 8 Check the MAREDO minimal once a week to ensure there are no loose bolts and nuts Check for damages too and...
Page 3: ...ICATIONS Model GT 210 061 Working width 520 mm 21 per head Working depth 5 35 mm 0 25 1 5 Hole spacing 40 x 45 mm 1 50 x 1 77 Number of holes 700 per m 560 per sq yd Driving speed 0 5 5 0 km h 0 3 3 m...
Page 4: ...y otherwise stay at 75 At the end of the pass reduce engine rpm till 75 and raise the units NOTE Because the spikes start spinning when dropping the heads they may hurt the turf Start with lower rev s...
Page 5: ...5 MAINTENANCE CHECK BOLTS AND NUTS REGULARLY...
Page 6: ...odel greensmower see the instructions supplied with the parts kit itself We also may need to change the drive side of one unit depending on the greensmower model Here under the change from Right to Le...
Page 7: ...7...
Page 8: ...8...