Bathroom Products Australia
2/97 Banksia St.
Botany, NSW, 2019
Tel: 1300 717 717
Fax: 1300 746 480
www.johnsonsuisse.com.au
2/2
INSTALLATION
• Place the basin at the required position.
• Mark the line for the top of the basin (recommended to be 800 -
820mm above finished floor level).
• Remove the basin, and mark the anchoring points 60mm
below the required top line, and 200mm around centerline of
basin (refer to diagram 1 and 2).
• Drill 2 holes 9.5mm in the wall (masonry), insert wall plugs and
screw in the Rag bolts securely. Position the basin, and secure
to the wall using the nuts and washers (refer to diagram 3).
If installing into a timber frame, drill a 5mm pilot hole and
thread rag bolt directly into timber.
• Ensure that the waste and water inlets are in place (refer to
diagram 1).
• Position Shroud under the basin in correct position, and mark
the outline of the shroud, and the position of the mounting
holes.
• Remove shroud, and at the mounting holes height mark the
wall holes position about 40mm inwards of the shroud outline.
• Drill 8mm holes, insert wall plugs and secure the mounting
elbows (refer to diagram 4).
• Make all water and waste connections as required.
• Hold shroud in place, secure with screws from sides, and put
plugs over holes.
• Seal around the sides and top of the basin with a suitable
silicone.
V0.0
Required Tools
Ÿ
Drill
Ÿ
Tape Measure
Ÿ
Spanners
Ÿ
Screwdriver
Ÿ
Hammer
Ÿ
Spirit level
Basin Top Line
60
200
RECOMMENDED
HEIGHT
~820
550*
620*
90*
* RECOMMENDED WATER INLET/OUTLET LOCATIONS
Diagram 1
Diagram 2
Diagram 3
Diagram 4
Outline of
Shroud
~40
DETAIL
L Bracket
Screw
Flange
Cap
= =
500
60
150
200
Anchor
Plastic flange
washer
Nut
Washer
Rag Bolt
Basin
550*
620*
90*
* RECOMMENDED WATER INLET/OUTLET LOCATIONS
440
500
60
150
200