Marbletrend Milano II MBSM850.1 Installation Manuallines Download Page 2

Bathroom Products Australia
2/97 Banksia St.
Botany, NSW, 2019

Tel:  1300 717 717

Fax: 1300 746 480

[email protected]

www.johnsonsuisse.com.au

2/2

INSTALLATION

• Place the basin at the required position.
• Mark the line for the top of the basin (recommended to be 800 - 

820mm above finished floor level).

• Remove  the  basin,  and  mark  the  anchoring  points  60mm 

below the required top line, and 200mm around centerline of 
basin (refer to diagram 1 and 2).

• Drill 2 holes 9.5mm in the wall (masonry), insert wall plugs and 

screw in the Rag bolts securely. Position the basin, and secure 
to the wall using the nuts and washers (refer to diagram 3).

 

If installing into a timber frame, drill a 5mm pilot hole and

 

thread rag bolt directly into timber.

• Ensure that the waste and water inlets are in place (refer to 

diagram 1).

• Position Shroud under the basin in correct position, and mark 

the  outline  of  the  shroud,  and  the  position  of  the  mounting 
holes.

• Remove shroud, and at the mounting holes height mark the 

wall holes position about 40mm inwards of the shroud outline.

• Drill  8mm  holes,  insert  wall  plugs  and  secure  the  mounting 

elbows (refer to diagram 4).

• Make all water and waste connections as required.
• Hold shroud in place, secure with screws from sides, and put 

plugs over holes.

• Seal  around  the  sides  and  top  of  the  basin  with  a  suitable 

silicone.

V0.0

Required Tools

 

Ÿ

Drill

Ÿ

Tape Measure

Ÿ

Spanners

Ÿ

Screwdriver

Ÿ

Hammer

Ÿ

Spirit level

Basin Top Line

60

200

RECOMMENDED

HEIGHT

~820

550*

620*

90*

* RECOMMENDED WATER INLET/OUTLET LOCATIONS

Diagram 1

Diagram 2

Diagram 3

Diagram 4

Outline of
Shroud

~40

DETAIL

L Bracket

Screw

Flange

Cap

=    =

500

60

150

200

 Anchor

Plastic flange
washer

Nut

Washer

Rag Bolt

Basin

550*

620*

90*

* RECOMMENDED WATER INLET/OUTLET LOCATIONS

440

500

60

150

200

Reviews: