background image

20.03.2009     

6

Assembly

1.

Screw the applicator unit support stand (A) together with 
the stand foot (B).

2.

Screw the spray hood together with the height 
adjustment (B) and the unit support beam (C).

3.

Connect the electrical plug connectors (D) together.

4.

Screw the flow rate control (E) onto the unit support 
beam (C).

5.

Screw the handle bar (G) together with the handle bar
extension (F)

6.

Insert the handle bar extension (F) into the unit support 
beam (C) and tighten securely.

7.

Slide the powerpack (H) into the designated bracket on 
the unit support beam (C) and tighten securely.

8.

Insert the phone jack (I) into the plug socket on the 
powerpack (H).

9.

Attach the hose (J) onto the lower side of the flow rate 
control (E).

Metering table
Roundup UltraMax application rate 2 l/ha at 20 °C

Spray width

in cm

Metering 

adjustment

knob position

Required output volume

in ml per atomiser

with 50 wheel revolutions

60
70
80
90

100
110

A
B
C
D
E
F

approx. 3.8
approx. 4.4
approx. 5.0
approx. 5.6
approx. 6.3
approx. 6.9

Calculating divergent application rates:

Factor x

Spray width in cm

=

Required volume per atomiser
in ml with 50 wheel revolutions

Factor for 1 l/ha: 0,031
Factor for 2 l/ha: 0,063
Factor for 3 l/ha: 0,094

Adjusting the spray width

a)

Loosen the spray hood screws in the elongated holes 
on the upper side of the sheet metal skirt and unscrew 
the screws from the front side of the sheet metal skirt.

b)

Adjust the segmental rotation atomiser to the desired 
width (see page 3 of the Operating Instructions).

c)

Retighten the screws.

Checking the output volume

1.

Place an underlay (e.g. cardboard or paper) on the 
ground and prop up the unit on stands.

2.

Fill the chemical tank with herbicide - undiluted.

3.

Remove the hose from the lower side of the flow rate 
control and place a measuring cup underneath.

4.

Open the shut-off valve, initially setting the metering 
adjustment knob to the maximum flow rate and 
simultaneously turning the wheel; wait until the 
chemical solution is evenly applied.

5.

Set the chemical solution volume according to the 
output table.

6.

Volume calibration: Collect the chemical solution from 
50 wheel revolutions into a measuring cup. If the 
desired volume is not reached, set a larger or a 
smaller volume with the pump metering adjustment 
knob.

7.

Perform volume calibration again.

8.

Reconnect the hose on the lower side of the flow rate 
control.

9.

The unit is now ready for deployment.

Maximum allowable wheel pressure 3.5 bar

Shut-off valve position closed

MANKAR-P 60-80
MANKAR-P 70-110

Spray hood 60-80

Summary of Contents for MANKAR-GP 60-80

Page 1: ...serve the requirements and regional regulations for the use of herbicides and if necessary obtain approval from the responsible authorities e g environmental conservation agency Application is to be p...

Page 2: ...ack the lamp illuminates 2 Insert the plug jack into the charger socket 3 Insert the charging unit into the 110 230 volt power outlet The battery has reached its full voltage capacity after approx 16...

Page 3: ...width of the spray hood The optimal spray width under standard operating conditions is set by the manufacturer Compensate for deviations is possible by loosening screw F and sliding the width adjustme...

Page 4: ...heel revolutions 2 l ha 3 l ha E H approx 6 3 approx 9 5 Checking the output volume 1 Place an underlay e g cardboard or paper on the ground and prop up the unit on stands 2 Fill the chemical tank wit...

Page 5: ...ole for MANKAR units 17 100390 Ball valve 1 4 i i 18 Pressure hose 4 x 2 mm 19 101276 Height adjustment for MANKAR P with tank holder 20 100397 Flow rate controler complete for MANKAR without holder 2...

Page 6: ...ha 0 063 Factor for 3 l ha 0 094 Adjusting the spray width a Loosen the spray hood screws in the elongated holes on the upper side of the sheet metal skirt and unscrew the screws from the front side o...

Page 7: ...or spray hood 70 110 cm 15 100400 Spray hood split 25 cm wide left for spray hood 70 110 cm 100426 Spray hood split 25 cm wide right for spray hood 70 110 cm 17 100434 Tank 1 L MANKAR without lid 18 1...

Page 8: ...r 2 l ha 0 100 Factor for 3 l ha 0 150 Adjusting the spray width a Loosen the spray hood screws in the elongated holes on the upper side of the sheet metal skirt and unscrew the screws from the front...

Page 9: ...ent bracket for powerpack MANKAR GP 20 100459 Powerpack with 1 battery 6 V 7 Ah for MANKAR 21 100379 Strain relief cover for spray hood 70 110 cm 22 100440 Holders for 2 flow rate controls MANKAR GP 2...

Page 10: ...7 100730 Glass fuse 5X20 T 3 15A 8 100466 Powerpack cover PartArt No Designation PartArt No Designation 100522 Metering pump MANKAR 3 capacity 5 10 ml min 100492 Metering pump MAFEX 3 capacity 2 20 ml...

Page 11: ...lue cable via the round pin plug Check to ensure the battery connection to the powerpack is correctly poled blue cable to Plus Atomiser spray too wide Width adjustment improperly set Loosen screws F s...

Page 12: ...re handled incorrectly VI The Vendor is not responsible for material defects on deliveries which he sources from third parties and forwards unchanged to the Customer Responsibility in the case of inte...

Reviews: