Step One:
Take foundation and insert it into the bottom
groove of the frame, as seen in the picture above.
You Will Need:
• Assembled Frame
• Rite-Cell
®
Foundation
Foundation
Step Two:
Bow the foundation out so you can get it to
snap into the top of the frame.
Step Three:
Move your hand down the foundation to snap it
into the top bar.
Completed Frame with Rite-Cell
®
Foun-
dation.
Bottom Groove
→
Bow Out
→
Snap Into Top Bar
→
IF YOU HAVE ANY QUESTIONS, FEEL FREE TO CONTACT THE MANN LAKE LOCATION NEAREST YOU
Completed Frame
You Are Now Ready For Foundation