![Manitowoc NBT60XL Operator'S Manual Download Page 124](http://html.mh-extra.com/html/manitowoc/nbt60xl/nbt60xl_operators-manual_701284124.webp)
SET-UP
OPERATOR MANUAL
NBT60XL
4-28
Published 11-01-2020 Control # 710-00
9.
Using counterweight control panel (Figure 4-16) located
on either side of superstructure, lower the counterweight
removal cylinders. For more information, see
10.
Attach removable counterweight to cylinders using
section attachment pins (6, Figure 4-20).
11.
Using the counterweight control panel (Figure 4-16),
fully raise counterweight removal cylinders. For more
information, see
Raising the Counterweight Cylinders
12.
Adjust bolts (8, Figure 4-19) as needed to level the
counterweight and eliminate any relative motion
between the upper and lower counterweight. Tighten the
jam nuts (9) to lock the counterweights into position.
13.
Repeat steps 4 to 12 as necessary for the remaining
counterweight sections.
Stowing the Bottom Counterweight(s)
1.
Position crane on a firm, level surface.
2.
Fully extend and set the outriggers, then level the crane
(see
FIGURE 4-20
1
Counterweight Section — Top
2
Counterweight Sections — Bottom
3
Removal Cylinders
4
Superstructure Attachment Pin
5
Cylinder Attachment Pin
6
Section Attachment Pin
7
Counterweight Control Panel
8
Bolt
9
Jam Nut
1
2
3
4
7
10261
5
8
9
10264
(3 Places per CWT)
10263
16000 lb (7558 kg)
Configuration Shown
6
Fo
r
Reference
Only