![Manitowoc National Crane NBT30H-2 Service Manual Download Page 93](http://html.mh-extra.com/html/manitowoc/national-crane-nbt30h-2/national-crane-nbt30h-2_service-manual_701273093.webp)
4
10
National Crane
03-20-2019 Control # 613-06
4-1
NBT30H-2 SERVICE MANUAL
BOOM MAINTENANCE
SECTION 4
BOOM MAINTENANCE
SECTION CONTENTS
Theory of Operation . . . . . . . . . . . . . . . . . . . . . . . . 4-1
Boom Removal from Truck . . . . . . . . . . . . . . . . . . 4-4
Lift Cylinder Removal . . . . . . . . . . . . . . . . . . . . . . 4-4
Boom Disassembly. . . . . . . . . . . . . . . . . . . . . . . . . 4-5
, 3
rd
, 4
th
Boom Section Removal . . . . . . . . . . . 4-5
, 3
rd
, 4
th
Boom Sections . . . . . 4-5
Additional Maintenance, Disassembled Boom . . . 4-6
Boom Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6
Extend/Retract Cable Installation . . . . . . . . . . . . . 4-8
Telescope Cylinder Installation . . . . . . . . . . . . . . . 4-9
/3
rd
/4
th
Boom Section Installation . . . . . . . . . 4-10
Boom Cable Tensioning . . . . . . . . . . . . . . . . . . . . 4-11
Cable Tensioning. . . . . . . . . . . . . . . . . . . . . . . . . 4-11
Cable Tension Sequence . . . . . . . . . . . . . . . . . . 4-12
4- Section Boom w/ 2 Stage Cylinder Cable
Positioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13
4- Section Boom w/ 1 Stage Cylinder Cable
Positioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-14
3- Section Boom w/ 1 Stage Cylinder Cable
Positioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-15
Cable Retention . . . . . . . . . . . . . . . . . . . . . . . . . . 4-16
THEORY OF OPERATION
The boom is a four section boom that uses a hydraulic
telescope cylinder and internal cables to extend and retract
the boom. A lift cylinder located under the boom is used to
raise and lower the boom.
The telescope cylinder is two-stage, double acting, and
attached to and extends the 1
st
, 2
nd
, and 3
rd
boom sections.
Extend cables are used to extend the 4
th
boom section
The telescope cylinder retracts the 1
st
and 2
nd
boom
sections. Retract cables are used to retract the 3
rd
and 4
th
boom sections.
The extend cables for the 4
th
section are attached to the rear
of the 2
nd
boom section, reeved around sheaves on the front
of the telescope cylinder and attached to the rear of the 4
th
boom section.
The retract cables for the 4
th
boom section are attached to
the front of the 2
nd
boom section, reeved around sheaves on
the rear of the 3
rd
boom section, and attached to the rear of
the 4
th
boom section.
The retract cables for the 3
rd
boom section are attached to
the front of the 1
st
boom section, reeved around sheaves at
the rear of the 2
nd
boom section, and attached to the rear of
the 3
rd
boom section.
A proportioning cable is attached to the rear of the 1
st
boom
section, reeved around a sheave at the front of the 2
nd
section, and attached to the rear of the 3
rd
section. This
cable maintains proper telescope cylinder proportion and
equal boom section extension.
Summary of Contents for National Crane NBT30H-2
Page 1: ...Service Manual National Crane NBT30H 2 ...
Page 2: ......
Page 40: ...1 30 03 20 2019 Control 613 06 INTRODUCTION NBT30H 2 SERVICE MANUAL ...
Page 92: ...ELECTRIC SYSTEM NBT30H 2 SERVICE MANUAL 3 24 03 20 2019 Control 613 06 ...
Page 110: ...BOOM MAINTENANCE NBT30H 2 SERVICE MANUAL 4 18 03 20 2019 Control 613 06 ...
Page 132: ...SWING NBT30H 2 SERVICE MANUAL 6 14 03 20 2019 Control 613 06 ...
Page 142: ...OUTRIGGERS NBT30H 2 SERVICE MANUAL 7 10 03 20 2019 Control 613 06 ...
Page 158: ...LUBRICATION NBT30H 2 SERVICE MANUAL 8 16 03 20 2019 Control 613 06 ...
Page 190: ...SCHEMATICS NBT30H 2 SERVICE MANUAL 10 2 ...
Page 193: ......
Page 194: ......