![Manitowoc Grove TMS800E13 Operator'S Manual Download Page 61](http://html.mh-extra.com/html/manitowoc/grove-tms800e13/grove-tms800e13_operators-manual_701232061.webp)
GROVE
3-13
TMS800E13 OPERATOR MANUAL
OPERATING CONTROLS AND PROCEDURES
3
Published 02-06-2014, Control # 495-00
Additional Carrier Controls and Indicators
NOTE:
The following paragraphs describe the additional
controls and indicators located on the carrier to
o p e r a t e t h e o u t r i g g e r s . T h e n u m b e r s i n
parentheses ( ) represent the index number from
Figure 3-2.
Outrigger Control Summary
NOTE:
The park brake and the hydraulic pump must be
engaged for outrigger operation.
There is an outrigger control panel located on each side of
the crane carrier. Each panel contains switches for extending
and retracting the outrigger beams and for raising and
lowering the outrigger stabilizer (jack) cylinders on all sides
of the crane. Each control panel also contains a control
switch for raising and lowering the center front stabilizer. The
following paragraphs explain these controls.
Outrigger Control Panel
There is one outrigger control panel (1) on each side of the
crane’s frame. The panel on the right side operates the
outrigger beams for that side only. The panel on the left side
operates the outrigger beams for that side only. All the
stabilizers may be operated from the left or right side of the
crane.
Outrigger Beam Selector Switch
The outrigger beam selector switch (2) is used to indicate
desired operation of the front or rear outrigger beam for the
side of the crane the control panel is on.
Extend/Retract Switch
The extend/retract switch (3) will operate both the outrigger
beams or the stabilizers. After positioning the desired
selector switch, positioning the extend/retract switch
energizes the control solenoid to allow hydraulic fluid to flow
through the control solenoid valve and the individual
solenoid valve and move the selected component in the
desired direction. In addition, when the switch is positioned
to either position, a signal is sent to the engine ECM to
increase engine speed above idle for operation of the
outriggers.
Center Front Stabilizer Switch
The center front stabilizer switch (4) is located in the center
of the outrigger control panel. It must be used in conjunction
with the extend/retract switch to control the operation of the
center front stabilizer. The center front stabilizer will retract
automatically when any of the other four stabilizers are
retracted; therefore, it must be reset if any craning functions
are to be continued.
Stabilizer Selector Switches
The Stabilizer Selector switches (5) when used in
conjunction with the Extend/Retract switch (3) will control the
desired stabilizer(s).
Emergency Stop Switch
The emergency stop switch (7) is located on the left center
side of the outrigger panel. Push the switch to stop the
engine.
Pull switch out to restart the crane and resume operation.
NOTE:
If the emergency stop switch on either outrigger
control panel or in the superstructure cab is not
pulled out for normal operation, the emergency
stop indicator in the carrier cab will illuminate red
and engine will not start.
Daytime Running Lights
Daytime running lights is a feature in which the headlight low
beams will come on automatically anytime the carrier ignition
switch is in the on position, engine is running, and the park
brake is released regardless of the position of the headlight
switch.
SUPERSTRUCTURE CAB
Operator Display
The Operator Display(30) (Figure 3-3 through Figure 3-15)
has various screens that show engine and system indicators.
The display has five buttons that correspond to controls that
are shown on the display.
Splash Screen
This screen (Figure 3-3) is visible after key on and will
remain visible until the display has finished initializing.
Main Screen
This screen (Figure 3-4) is the operator's main screen and
will be the first screen visible after the splash screen. It
shows engine and crane system indicators and information.
FIGURE 3-3
Reference Only