![Manitowoc Grove GRT8120 Operator'S Manual Download Page 340](http://html.mh-extra.com/html/manitowoc/grove-grt8120/grove-grt8120_operators-manual_701202340.webp)
5-32
Published 3-22-2021, Control # 702-02
SET-UP AND INSTALLATION
GRT8120 OPERATOR MANUAL
c.
Install the fourth pin. Secure the fourth pin with
retaining clip.
d.
Turn the nob (3) to relieve the pressure to retract the
jack pin.
13.
Connect the boom extension electrical connector to the
main boom electrical connector. For more information,
see
Boom Extension Electrical Connections
14.
Make sure the boom extension is shown as erected in
the ODM (Figure 5-38).
15.
If installing the hydraulic boom extension, connect
hydraulic hoses. For more information, see
16.
Remove the slings from the boom extension.
17.
Raise the mast sheave assembly. For more information,
see
18.
Reeve the hoist rope. For more information, see
19.
Remove the anti-two block switch from the auxiliary
boom nose. For more information, see
, page 5-10. Install the anti-two block switch
on the boom extension. For more information, see
Anti-Two Block Switch on the Boom Extension
CAUTION
After installing the fourth pin, turn the pressure relief nob
(3) to retract the jack so the jack does not contact the
boom nose. Failure to retract the jack could result in
damage to the boom extension jack.
10035-2
FIGURE 5-38
Summary of Contents for Grove GRT8120
Page 1: ...Operator Manual Grove GRT8120 ...
Page 4: ...THIS PAGE BLANK ...
Page 16: ...TABLE OF CONTENTS GRT8120 A 12 THIS PAGE BLANK ...
Page 24: ...INTRODUCTION GRT8120 OPERATOR MANUAL 1 8 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Page 440: ...GRT8120 OPERATOR MANUAL A 10 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Page 447: ......
Page 448: ......