Published 01-08-13, Control # 049-05
4-81
2250 MAX-ER 2000 OPERATOR’S MANUAL
SET-UP AND INSTALLATION
4
FIGURE 4-46
S1
A
B
S3
S5
S7
S9
S2
S4
S6
S8
LOWER POINT SHEAVES
BOOM TOP
Tighten each side equally to provide an
equal gap. See NOTE 1 for torque value.
Clamp
Bolt
Nuts
Lockwasher
A616
Location of Guide Sheaves with Lead Line
Going to Lower Point Sheave Indicated
Lead Line to
Sheave
Dimension A
S1
5/8 in (16 mm) NOTE 2
S2
2-1/16 in (52 mm) NOTE 3
S3
4-15/16 in (127 mm) NOTE 3
S4
10-11/16 in (272 mm) NOTES 3 & 4
Dimension B
S6
10-7/16 in (265 mm) NOTE 3
S7
4-15/16 in (127 mm) NOTE 3
S8
2-1/16 in (52 mm) NOTE 3
S9
5/8 in (16 mm) NOTE 2
NOTE 1:
Hand position clamps tight against bearing.
Before torquing bolts, check that sheave
turns freely. Torque bolts lubricated with
S.A.E. 20 oil to 120 ft-lb (163 Nm).
NOTE 2:
This location requires sheave bearing to
bear up against boom top plate as shown at
Dimension B.
NOTE 3:
This location requires four clamps as shown
at Dimension A.
NOTE 4:
Also position guide sheave at this location
GUIDE SHEAVES
#79-44 Boom