![Manitowoc 16000WA Operator'S Manual Download Page 65](http://html.mh-extra.com/html/manitowoc/16000wa/16000wa_operators-manual_701142065.webp)
Reference
Only
Manitowoc
Published 03-18-13, Control # 116-09
4-35
16000 WIND ATTACHMENT OPERATOR’S MANUAL
SET-UP AND INSTALLATION
4
See Figure 4-21 for remaining steps.
9.
Connect the electric cable from the crane to the
controller on the boom butt:
a.
Remove terminator plug (1, View C) from electric
cable (2) on the crane.
b.
Connect electric cable (3) from the boom butt to
cable (2).
10.
Connect electric cables (4, View B) and (5 optional) from
the boom butt to the node on the front of the rotating
bed.
11.
Remove pins (6, View A) from links (7).
12.
Lower the mast until the holes in mast straps (8, View A)
are aligned with the holes in links (7).
13.
Install pins (6, View A).
14.
Fully lower the mast arms using the switch on the
remote control.
15.
Select the proper capacity chart on the configuration
screen of the RCL display.
DANGER
Falling Mast/Boom Hazard!
Prevent mast and boom from falling:
•
Fully lower mast arms before raising boom.
Mast can
buckle and collapse if it contacts mast arms with a
fully rigged boom.
Summary of Contents for 16000WA
Page 1: ...R e f e r e n c e O n l y Operator Manual Manitowoc 16000WA ...
Page 2: ...R e f e r e n c e O n l y ...
Page 4: ...R e f e r e n c e O n l y The original language of this publication is English ...
Page 8: ...R e f e r e n c e O n l y ...
Page 10: ...R e f e r e n c e O n l y ...
Page 20: ...R e f e r e n c e O n l y ...
Page 24: ...R e f e r e n c e O n l y ...
Page 26: ...R e f e r e n c e O n l y ...
Page 92: ...R e f e r e n c e O n l y ...
Page 94: ...R e f e r e n c e O n l y ...
Page 96: ...R e f e r e n c e O n l y ...
Page 106: ...R e f e r e n c e O n l y ...
Page 109: ...R e f e r e n c e O n l y ...
Page 110: ...R e f e r e n c e O n l y ...