background image

8

 Wiring diagrams

1

2

S3

S1 S2

S5

S4

S6

N L1

<5°

<80°

BAT

Tf

Tf

LED

1

2

S3

S1 S2

S5

S4

S6

<5°

<80°

BAT

Tf

Tf

LED

~

-

+

  Before commissioning the dampers and during their subsequent operational checks, it is necessary to

check  and  functionally  test  all  the  designs,  including  the  operation  of  any  electronic  elements.  Upon
commissioning, these operational checks must be completed at least twice a year. If no defect is found
during two consecutive operational checks, then operational checks may be completed once a year.

  Prior to the commissioning of the dampers and subsequent operational checks, the following checks

must be completed with all the designs:

 

Visual inspection for proper damper installation, damper interior, damper blade, blade seating surfaces,
and silicone seal.

Removing the inspection opening cover:  Unscrew the pan head screws (2 pcs) and tilt remove the cover.

AC 230V / 5A

IP 67

-25°C … +120°C

1(COM) - black wire
2(NC) - 

gray wire

4(NO) - 

blue wire

This limit switch is possible to connect in following two versions:

a) 

 if the arm is moving … connect wire 1+2

b) 

 if the arm is moving … connect wire 1+4

Summary of Contents for FDMR 60

Page 1: ......

Page 2: ...er EN 13501 3 A1 Fire damper FDMR Solid wall construction Mortar or gypsum Duct 100 40 Fire damper FDMR Solid wall construction Stuffing box mineral stone wool min density 140 kg m Fire protection mas...

Page 3: ...tic min thickness 1 mm Fibreglass felt with aluminium foil thickness 5 mm width 50 mm Duct 100 Installation opening has to be reinforced by profile UW CW Profil is fixed by screws 3 5 mm with cor resp...

Page 4: ...nsity 140 kg m Fire protection mastic min thickness 1 mm Fibreglass felt with aluminium foil thickness 5 mm width 50 mm Duct 40 Fire damper FDMR Solid ceiling construction Mortar or gypsum Duct 40 50...

Page 5: ...5 300 50 120 D 110 400 180 50 300 50 53 110 400 180 50 D...

Page 6: ...terial The distance between the fire damper and structure wall ceiling must be at least 75 mm If two or more dampers are to be installed in one fire separating structure the distance between the adjac...

Page 7: ...rocess Once the damper is built installed its blade must not grind on the damper body during its opening or closing The damper installation procedures must completely exclude any transfer of loads fro...

Page 8: ...al checks then operational checks may be completed once a year Prior to the commissioning of the dampers and subsequent operational checks the following checks must be completed with all the designs V...

Page 9: ...status it is possible to remove the whole mechanism from the fire damper body the mechanism is attached to the damper body with four M6 screws After the thermal fuse removal from its holder in the ini...

Page 10: ...stos free fire resistant mineral fibre boards The damper control devices are made of galvanized materials alternatively of stainless steel without any additional surface finish The springs are galvani...

Page 11: ...reserves the right for innovations of the product For actual product information see www mandik com MAND K a s Dob sk 550 26724 Hostomice Czech Republic Tel 420 311 706 706 E Mail mandik mandik cz ww...

Reviews: