![M&G DuraVent PolyPro Installation Instructions Manual Download Page 13](http://html.mh-extra.com/html/mandg/duravent-polypro/duravent-polypro_installation-instructions-manual_682458013.webp)
13
Figure 13
Flat Roof
Adjustable Roof Flashing,
Aluminum (0/12 - 5/12 Pitch)
Adjustable Roof Flashing,
Polypropylene (5/12 - 12/12 Pitch)
Figure 14
Figure 15
Important
do not turn the cap.
Figure 16
CO-LINEAR
ADAPTER
AIR INLET
EXHAUST
to secure the Firestop Spacer in place.
3.
Determine the location of the roof
penetration.
Cut a hole from the exterior of
the roof. Important: Make sure that no dirt
or debris drop into the boiler exhaust or air
intake piping.
(Figure 14).
4.
Place the Flashing into position on the roof.
5.
Carefully lower the Vertical Termination
Cap down through the Flashing from the
roof.
(Figure 15).
6.
Verify that the Vertical Termination Cap is
plumb using a level or similar device.
7.
Fix the roof clamp (supplied) around the base
of the Vertical Termination Cap and secure roof
clamp to a nearby framing structure. Do not
tighten the clamp yet.
Summary of Contents for DuraVent PolyPro
Page 15: ...15 ...