background image

Lay out base ensuring Velcro flap is in front right corner.
Assemble floor poles, 3-way corners and 3-way T pieces as shown.

3-Way Corner

Velcro Flap

Step 1

3-Way T Piece

Insert lower wall poles into 3-way corners and 3-way T pieces.
Fit straight connectors.
Insert upper wall poles into straight connectors.
Fit 3-way corners, 3-way T pieces and 4-way joins on top.

3-Way Corner

Straight Connector

Step 2

4-Way Join

4-Way Join

Insert ceiling poles into 3-way corners, 3-way T pieces, 4-way joins and 5-way joins.
Fit equipment hanger ends to poles. Position equipment hangers as required.
Fit support poles into 5-way joins at the top and support pole feet at the bottom.

 Equipment
Hanger End

Step 3

 5-Way Join

 Support Pole
       Foot

Fit roof ensuring Velcro 
flap is in front right corner.

Step 4

Velcro Flap

Reviews: