Lay out base ensuring Velcro flap is in front right corner.
Assemble floor poles, 3-way corners and 3-way T pieces as shown.
3-Way Corner
Velcro Flap
Step 1
3-Way T Piece
Insert lower wall poles into 3-way corners and 3-way T pieces.
Fit straight connectors.
Insert upper wall poles into straight connectors.
Fit 3-way corners, 3-way T pieces and 4-way joins on top.
3-Way Corner
Straight Connector
Step 2
4-Way Join
4-Way Join
Insert ceiling poles into 3-way corners, 3-way T pieces, 4-way joins and 5-way joins.
Fit equipment hanger ends to poles. Position equipment hangers as required.
Fit support poles into 5-way joins at the top and support pole feet at the bottom.
Equipment
Hanger End
Step 3
5-Way Join
Support Pole
Foot
Fit roof ensuring Velcro
flap is in front right corner.
Step 4
Velcro Flap