background image

OWNER’S MANUAL

E300 ADJUSTABLE BASE

iv

iii

PRODUCT

RATINGS

MOTOR RATINGS

POWER RATINGS

FCC COMPLIANCE

 

 The•Structures™•E300•Adjustable•Base•motors•are•not•designed•to•operate•for•more•than•two•

[2]•continuous•minutes•within•an•eighteen•[18]•minute•time•period.•Exceeding•this•rating•will•shorten•

the•life•of•the•motors,•and•will•void•the•warranty.

 

 This•product•is•designed•to•have•no•maintenance•requirements•by•the•user.•Please•do•not•open•

any•motor•compartments,•alter•the•wiring,•modify•the•base,•or•change•the•product•in•any•way•as•

it•will•void•the•warranty.•••

 

  

INPUT:

 

AC 100-240V - 50/60Hz, 1.5 Amp

 

  

OUTPUT:

 

DC 29V-2A

 

 This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device 

may not cause harmful interference, and (2) this device must accept any interference received, including interference 

that may cause undesired operation. 

••Operates•on•2.4•GHz•frequency•transmitter.

 

 To comply with the FCC RF exposure requirements, no change to the antenna or the device is permitted. Any change 

to the antenna or the device could result in the device exceeding the RF exposure requirement and void user’s right 

to operate the device.

For•any•questions•or•concerns•regarding•this•product•please•contact•

malouf

®

•directly:

IMPORTANT: USE THIS PRODUCT ONLY AS DESCRIBED IN THESE 

INSTRUCTIONS. DO NOT MODIFY ANY PARTS OR COMPONENTS.

Summary of Contents for STRUCTURES E300

Page 1: ...OWNER S MANUAL E300 ADJUSTABLE BASE This STRUCTURES product is backed by a 20 year limited warranty For more information visit www maloufsleep com...

Page 2: ...emakers may detect motion by this product as a false sense of movement and or exercise This may or may not affect your pacemaker Talk to a physician to address any concerns Immediately dispose of all...

Page 3: ...1 5 Amp OUTPUT DC 29V 2A This device complies with part 15 of the FCC Rules Operation is subject to the following two conditions 1 This device may not cause harmful interference and 2 this device mus...

Page 4: ...ADJUSTABLE BASE vi v CONTENTS Overview 1 2 3 8 9 12 13 16 19 22 17 18 23 24 Assembly Synchronizing Two Bases Electrical Components and Backup Battery Test All Functions Additional Help Warranty Inform...

Page 5: ...components See the adjacent image for a detailed overview If any parts or components are missing or are different than shown in the adjacent image do not attempt to complete the assembly process and...

Page 6: ...n the floor see image A Remove all plastic and zip ties All components and parts are located in the underside of the base Remove attached parts and set aside in preparation for assembly see image B Ch...

Page 7: ...or an inside placement We recommend using the outside holes for added security Tighten the legs in the location of your choosing maintaining a consistent inside or outside location throughout Take ca...

Page 8: ...e Move the bed to the desired location Step 6 To install the mattress retainer bar s insert one end of the retainer bar in its respective slot until it slides fully into place see image B Flex retaine...

Page 9: ...right image A for a complete list of remote control functions Remote Control Battery Installation Remove the battery cover on the back side of the remote control Insert two AAA batteries included as...

Page 10: ...sure the remote batteries are functioning Replace if necessary Step 2 Ensure the power cord is plugged into a powered source Step 3 Press and hold the HEAD UP and FOOT UP buttons simultaneously see im...

Page 11: ...nder the head portion of the bed base at two locations see image B To access the USB ports press the HEAD UP button to raise the bed and reveal the USB ports Once your device is plugged into the USB p...

Page 12: ...e occurs install the 9V batteries into the power supply to allow temporary power to the base see image A Installing Batteries Unplug the power cord from the outlet and remove the cover from the compar...

Page 13: ...source Step 2 Make sure Remote A was already paired to Base A and Remote B was paired to Base B If not pair them by following the instructions found on pages 13 14 Step 3 After remotes are paired to t...

Page 14: ...L FUNCTIONS Overview To ensure proper setup use remote and test all functions for 3 seconds Important Always return the base to the flat position when switching between preset options Head Up Memory P...

Page 15: ...r 1 hour to reset the electronic components Plug base into a different electrical outlet or test current outlet with another working appliance A grounded electrical surge protector is recommended with...

Page 16: ...uding warranties of merchantability and fitness for a particular purpose and all other warranties otherwise arising by operation of law course of dealing custom trade or otherwise Malouf shall not be...

Reviews: