Malone MPG449 Assembly/Installation Instructions Download Page 3

MALONE

R

Hardware Kit (1)

7’ Carpeted Bunks (2)

Changing the load bars

D-Rings (4)

Load Bars (2) and Brackets (4)

Load

Straps (2)

1). Remove the bolts holding each black bracket to the support tube and remove Xbars from trailer. 

See figure 1.

2). Slip the new load bar brackets over the new load bars (as shown) and loosely install the two

small bolts / nuts through each bracket trapping the load bars inside the brackets. See figure 2.

3). Install and hand tighten the bolts holding each bracket to the support tube. See figure 3.

4). Center the load bars to the trailer, then tighten all 8 bracket bolts. See figure 4.

3

1

2

4

Reviews: