![Malone MegaSport MPG550LB Manual Download Page 7](http://html1.mh-extra.com/html/malone/megasport-mpg550lb/megasport-mpg550lb_manual_3925757007.webp)
800-295-0042 ext 215
5
MAIN FRAME ASSEMBLY (Group 1)
1. We start the assembly of the Main frame first, right side up. Aline all the cross members as shown.
NOTE: Direction of 3rd cross member faces forward. Install the bolts downward from the top and secure
with nylon lock nut.
Hand Tighten Only.
Measuring from the rear corners diagonally to the front corners will insure your frame is square. Adjust
as needed and
fully secure
the 4 corners.
We now flip the main frame
on its back
to make it easier to install the tongue frame, springs and axle.
Once the springs and axle assembly is installed we will flip the trailer over to complete the assembly.
2. With the frame components
upside down as shown install the
remaining hardware for the cross
members, fully tighten the four
corners first, again measuring to
insure the frame is square.
NOTE: Skip the bolts for the 4th
cross member from the front
until we add the frame rail for
the tongue.
The spring bracket mounting holes
should be facing up. All the decals
should be upside down.
Securing four corners
spring bracket mounting
holes
MALONE
R
5
800-295-0042 ext.215
Summary of Contents for MegaSport MPG550LB
Page 23: ...MALONE R technical maloneautoracks com 21 800 295 0042 ext 215...
Page 24: ...MALONE R technical maloneautoracks com 22 800 295 0042 ext 215...
Page 25: ...MALONE R technical maloneautoracks com 23 800 295 0042 ext 215...
Page 26: ...MALONE R technical maloneautoracks com 24 800 295 0042 ext 215...
Page 28: ......
Page 30: ......