Before Installation
When preparing to install an AirMAX
TM
system, first
ensure you ve gathered all the information needed:
•
Analyze environmental and facility requirements and
determine antenna, ODU, and Power Injector
mounting locations. Ensure locations offer optimum
direction for the terrain.
•
Temperature limits at ODU mounting locations
should be within this range: -20
o
C to +70
o
C
•
Temperatures at Power Injector mounting locations
should meet normal office or home conditions.
•
Decide on antenna mounting specifics: do you want
to pole or wall-mount the ODU? Locate antenna as
high as practical for best coverage.
Summary of Contents for AirMAX 240
Page 1: ...AirMAXTM 240 2400 Installation Configuration Guide July 18 2002 P N 8000504 000 I...
Page 28: ...Chapter 2 Installation 22 Malibu Networks AirMAX CPE BTS...
Page 62: ...Chapter 3 Configuration 56 Malibu Networks AirMAX CPE BTS...
Page 66: ...Appendix A Specifications A 4 Malibu Networks AirMAX 240 2400 CPE BTS...
Page 67: ...Appendix B Drawings...
Page 78: ...Appendix C Glossary C 10 Malibu Networks AirMAX CPE BTS...