
VEE-GROOVE FABRICATION
22
23
#1
GRAY
VEE
RED
VEE
RED
VEE
RED
#5
BLUE
W1
H1
W2
H2
Move the square to the right to align your width dimen-
sion (W2) with the right edge of the previous cut. Place
the left side of the Vee Tool flush against the arm of the
square and push the tool along arm’s length to produce
a third vee groove.
Move the square one last time to align your height
dimension (H2) with the right edge of the last cut made
with Vee Tool. Place the left side of the FasGroov #5
Tool flush against the arm of the square and push the
#5 along arm’s length to produce a staple flap groove.
#5 TOOL
Insert the FGK FasGroov Duct Knife into the right edge
of the staple flap cut made with the #5 Tool. Cut com-
pletely through the foil to finish the grooving process.
Fold the duct section together. Staple and tape the
flap, join duct sections and install take-offs with
manufacturer-approved products.
FGK
Duct Knife
CUT
FLAP