5
FUNCTIONAL
DESCRIPTION
CAUTION:
•
Always be sure that the tool is switched off and unplugged before
adjusting or checking function on the tool.
Switch action
CAUTION:
•
Before plugging in the tool, always be sure that the tool is switched off.
To start the tool, move the switch lever to the “I” position. To stop the tool,
move the switch lever to the “O” position.
ASSEMBLY
CAUTION:
•
Always be sure that the tool is switched off and unplugged before
carrying out any work on the tool.
Installing or removing wheel point
Loosen the collet nut and insert the wheel point into the collet nut. Use one
wrench to hold the spindle and the other one to tighten the collet nut securely.
The wheel point should not be mounted more than 8 mm from the collet nut.
Exceeding this distance could cause vibration or a broken shaft.
To remove the wheel point, follow the installation procedure in reverse.
CAUTION:
•
Use the correct size collet cone for the wheel point which you intend to
use.
1. Switch lever
1
007132
1. Wrench 13
2. Collet nut
3. Wrench 13
1
2
3
007142
8mm(5/16”)Max.
003495
Summary of Contents for MT910
Page 7: ...Memo 7...