![Makita GD0603 Technical Information Download Page 13](http://html1.mh-extra.com/html/makita/gd0603/gd0603_technical-information_4312750013.webp)
W
iring diagram
P 13/ 14
(3)
Area A
(26)
(4)
(7)
Rib B
(rC)
(rD)
(rF)
(rG)
(rE)
(2)
(19)
Rib A
Boss
Terminal block (3) has to be so put that the Lead
wire (blue) of Power supply cord can be easily
guided out toward Switch (4) side through the
route between Rib E (rE) and Rib G (rG).
These lead wires must be tight
in Area A so as not to make slacks.
(19)
Pass Field lead wires (Purple, Black) under
Brush holders (19).
Pass Field lead wires (Purple, Black) between
Rib A and Rib B.
Put Lead wire (brown) of
Power supply cord between
Rib E (rE) and Rib F (rF).
Put the sag of Field lead wire
(black) and Lead wire (white)
of noise suppressor connected
to Switch, to the left side of
broken line.
Pass the following Lead wires
between Rib E (rE) and Rib G (rG)
if Terminal block (3) is used.
* Lead wires (blue) (brown) of Power
supply cord
* Lead wire (white) of Noise
suppressor connected to Switch (4).
Pass Field lead wires (Orange, White) under
Brush holders (19).
Pass Field lead wires (Orange, White) between
Rib A and Rib B.
Fig. D-3
Put Brush holders (19) as drawn.
Put Choke coils (if used) between
Brush holder and Cord clamp (7).
Choke coil (if used)
Put Choke coils
(if used) between
Brush holder and
Cord clamp.
Put Noise suppressor
(2) (if used) in this
area.
Do not put Lead wires
on Rib G.