P
5
/ 1
2
R
epair
[3] -3. Spiral bevel gear [large one], Ball bearings 696ZZ/ 6201DDW
ASSEMBLING
DISASSEMBLING
(3) Assemble Gear housing cover with Armature and Gear housing to Motor housing as drawn in
Fig. 5
.
Note
: The gear and the ball bearings can be replaced without disassembling the motor section.
(1) Remove Ball bearing 696ZZ, Retaining ring S-9, Flat washer 10 and C-type plate from Spindle as drawn in
Fig. 6
.
Fig. 5
Fig. 6
Armature
Notch on Gear housing cover
Name plate
1. Removing four M4x16 Hex socket head bolts, then separate Bearing box section from Gear housing.
1. Assemble Gear housing cover together with Armature
while facing its notch to the same side as Name plate.
2. Assemble Gear housing while facing Spindle
to the same side as the notch and Name plate.
Name plate
Gear housing
Spindle
Bearing box
section
2. Remove Ball bearing 696ZZ
with 1R269.
3. Remove Retaining ring S-9
with 1R291.
4. Remove Flat washer 10.
Then, remove C-type plate.
Ball bearing
696ZZ
Retaining
ring S-9
Flat washer 10
C-type plate.
[3] DISASSEMBLY/ASSEMBLY
[3] -2. Armature, Spiral bevel gear [small one] (cont.)