background image

R

epair P 3 / 5 

-5°  

20°

Fig. 4

( 4 ) Assembling lever plate
        Lever plate's angle against base has to be as illustrated in Fig.4, when the machine is adjusted
        to max. cutting depth. 

( 1 ) Disassembling gear section 
        After removing ball bearing 608ZZ, hold ring 12 installed to bearing box, with 1R031"bearing setting pipe". 
        And disassemble spindle by pressing it down with arbor press as illustrated in Fig. 5.
        So, the gear section can be disassembled as illustrated in Fig. 5A.

 Do not forget to assemble 2 pcs. of flat washers 8 between blade case and depth guide, when assembling
 lever plate.   See Fig. 4A.  

2 pcs. of Flat washers 8

Depth guide

Blade case

 Lever plate

 Hex nut M8

< 2 > Replacing gear section

Fig. 4A

Ring 12 : Hold this part with 1R031
               "bearing setting pipe". 

1R031 "Bearing setting pipe"

Arbor press

Disassembled spindle

Fig. 5

Sleeve 12

Bearing box

Spindle

Helical gear 49

Ring 12

Fig. 5A

Ball bearing 
608ZZ

Reviews: