PM SERIES
UDD-SD-125/
Release Date: 20.01.2015/Rev No: 0/Rev.
Date
:
18
200/320kVA Terminal Block:
Terminal sequence from left to right: input phase A(L1),input phase B(L2),input phase
C(L3),input Neutral line, output Neutral line, output phase A(L1), output phase B(L2), output
phase C(L3);battery positive, battery Neutral, battery negative, ground, bypass input phase
A(L1),bypass input phase B(L2),bypass input phase C(L3).
520kVA Terminal Block:
In front of the UPS Back of the UPS
Terminal sequence from left to right: input phase A(L1),input phase B(L2),input phase
C(L3),input Neutral line, output phase A(L1), output phase B(L2), output phase C(L3);battery
positive, battery negative, output and battery Neutral, ground, bypass input phase A(L1), bypass
input phase B(L2),bypass input phase C(L3).
Choose appropriate power cable. (Refer to the table above) and pay attention to the diameter of
the connection terminal of the cable that should be greater than or equal to that of the
connection poles;