
LEVELUPS SERIES 10-20 KVA
PRODUCT DESCRIPTION
AG-SD-83 / Publication Date: 15.09.2014 / Rev. No: 0 / Rev. Date:
Battery tests are performed by directing the power to the mains, independently from the loads.
If the mains values change during the test and are out of limits, the test will be canceled.
Status
> Battery
>menu timers shows the remaining time to the next test.
If “
Stop Battery Test
” command is chosen, UPS cancels the battery test and returns the
previous operating mode.
2.
4.6 Status Menu
On this menu you can see information
about the mains, output, bypass line, battery,
temperature, inverter and alarms.
Mains
UP, I, F
Voltage, current and frequency of each phase (phase-neutral)
S, P, PF
Active power, apparent power and power factor of each phase
Output
UP, I , F
Voltage, current and frequency of each phase (phase-neutral)
S, P, PF
Active power, apparent power and power factor of each phase
L, CF
Load percent of each phase and crest factor
Bypass
UP, I, F
Voltage, current and frequency of each phase (phase-neutral)
Battery
Mode
UPS operation mode
U, I, °C
Charging voltage, current and temperature.
Charge %
Charge percentage.
Autonomy Time
Remaining back-up (autonomy) time
Last Test Result
Capacity and status according to the last test results
Next Test Date
Next test date, time and remaining time for test
Temperature
°C,°C,°C,°C,°C
Rectifier, inverter, charger, ambient, battery and thyristor temperatures