PRE-INSTALLATION INFORMATION
FIREPLACE FRAMING
Firebox framing can be built before or after the appliance is set in place. Construct firebox framing following
Figure 2
and
the chart below for your specific installation requirements.
See Figure 3 on Page 8
for firebox dimensions. The framing
headers may rest on the top of the firebox standoffs.
Do not bring headers below top of standoffs.
The firebox may be installed directly on a combustible floor or raised on a platform of an appropriate height. When the
firebox is installed directly on carpeting, tile, or other combustible material, other than wood flooring, the firebox shall be
installed on a metal or wood panel extending the full width and depth of the enclosure.
300
400
500
600
A
33
1
/
"
37
1
/
"
41
1
/
"
47
1
/
"
B
37
1
/
4
"
40
7
/
8
"
40
7
/
8
"
40
7
/
8
"
C
28
1
/
4
"
9
1
/
4
"
33
1
/
4
"
39
1
/
4
"
D
14
1
/
8
"
14
5
/
8
"
16
5
/
8
"
19
5
/
8
"
E
55
11
/
16
"
60
7
/
8
"
64
7
/
8
"
70
7
/
8
"
F
7
13
/
16
"
30
7
/
16
"
3
7
/
16
"
35
7
/
16
"
G
13
3
/
4
"
15
3
/
4
"
15
3
/
4
"
15
3
/
4
"
H
39
3
/
8
"
43
1
/
16
"
45
7
/
8
"
50
1
/
8
"
Corner Installation
Stud Location
Inside Chase Installation
Recessed Installation
Do not fill spaces around firebox with
insulation or other materials. This
could cause a fire.
W
ARNING
Figure 2 - Framing Dimensions