Maine Cottage MC1805 Assembly Instructions Download Page 3

BUNK BED ASSEMBLY INSTRUCTIONS

PARTS LIST

866-366-3505 M-F, 9-5

STEP ONE:

ASSEMBLE BOTTOM BUNK BED

866-366-3505 M-F, 9-5

A. 

Position Headboard in the desired location of 

the room, using a wall to support if necessary. 
Attach one Side Rail to the Headboard and 
then the other Side Rail to the Headboard.

B.

 To attach the Side Rails, align the metal male 

component on the Side Rail with the female 
component on the metal bracket on the Head 
Post. Press down until it “clicks” into place. 

C. 

It is recommended to attach both 

Side Rails to the Head Board first then 
repeat the connections on the opposing 
Headboard.

STEP THREE:

STACK ON THE TOP BUNK

Move assembled bottom bunk into permanent 
location, lifting only by headboard and foot-
board. 

Lifting by the Side Rails will disengage 

the locked buttons. 

Check for square and en-

sure that all brackets are fully connected and 
that the slats are still in their correct positions. 
Put a metal connector into the hole on top of 
each Head Board Post.

Note the numbers next to the holes on the 
bed. Place both corresponding footboards on 
top of their sister headboards. Attach the two 
side rails just as you did with the bottom bunk 
in step one.

STEP TWO:

CONNECT THE SECOND HEADBOARD

Connect the second Headboard the same 
way as the first Headboard was connected. 
Yes, there will be two headboards on the 
Bottom Bunk!

Metal Bunk Connector

NOTE: We recommend two people assemble our Beds.

STEP THREE:

STACK ON THE TOP BUNK

Move assembled bottom bunk into permanent 
location, lifting only by headboard and foot-
board. Lifting by the Side Rails will disengage 
the locked buttons. Check to make sure bed 
is square and ensure that all brackets are fully 
connected. Put a metal connector into the hole 
on top of each Headboard Post.

Note the numbers next to the holes on the bed. 
Place both corresponding Footboards on top 
of their sister Headboards. Attach the two side 
rails just as you did with the bottom bunk in 
step one.

C.

 It is recommended to attach both Side 

Rails to the Headboard first then repeat the 
connections on the opposing Headboard.

Reviews: