![Maine Cottage MC1805 Assembly Instructions Download Page 3](http://html1.mh-extra.com/html/maine-cottage/mc1805/mc1805_assembly-instructions_695573003.webp)
BUNK BED ASSEMBLY INSTRUCTIONS
PARTS LIST
866-366-3505 M-F, 9-5
STEP ONE:
ASSEMBLE BOTTOM BUNK BED
866-366-3505 M-F, 9-5
A.
Position Headboard in the desired location of
the room, using a wall to support if necessary.
Attach one Side Rail to the Headboard and
then the other Side Rail to the Headboard.
B.
To attach the Side Rails, align the metal male
component on the Side Rail with the female
component on the metal bracket on the Head
Post. Press down until it “clicks” into place.
C.
It is recommended to attach both
Side Rails to the Head Board first then
repeat the connections on the opposing
Headboard.
STEP THREE:
STACK ON THE TOP BUNK
Move assembled bottom bunk into permanent
location, lifting only by headboard and foot-
board.
Lifting by the Side Rails will disengage
the locked buttons.
Check for square and en-
sure that all brackets are fully connected and
that the slats are still in their correct positions.
Put a metal connector into the hole on top of
each Head Board Post.
Note the numbers next to the holes on the
bed. Place both corresponding footboards on
top of their sister headboards. Attach the two
side rails just as you did with the bottom bunk
in step one.
STEP TWO:
CONNECT THE SECOND HEADBOARD
Connect the second Headboard the same
way as the first Headboard was connected.
Yes, there will be two headboards on the
Bottom Bunk!
Metal Bunk Connector
NOTE: We recommend two people assemble our Beds.
STEP THREE:
STACK ON THE TOP BUNK
Move assembled bottom bunk into permanent
location, lifting only by headboard and foot-
board. Lifting by the Side Rails will disengage
the locked buttons. Check to make sure bed
is square and ensure that all brackets are fully
connected. Put a metal connector into the hole
on top of each Headboard Post.
Note the numbers next to the holes on the bed.
Place both corresponding Footboards on top
of their sister Headboards. Attach the two side
rails just as you did with the bottom bunk in
step one.
C.
It is recommended to attach both Side
Rails to the Headboard first then repeat the
connections on the opposing Headboard.