28
UK | Ersatzteile
UK
Mounting instructions for
PPB 30 final mounting kit
These mounting instructions contain impor-
tant information about
final mounting of the
drawer units and internal covers
. Final
mounting is undertaken once the plastering
and paint work is complete.
Please read these instructions carefully. Fol-
low the instructions. Pay particular attention
to the safety instructions.
Before commissioning, also read the en-
closed operating instructions.
Hand the instructions to the owner for
safe-keeping once the installations are com-
plete.
Commissioning instructions
online
Information about system and unit settings
(service mode). Download using QR code or
from www.maico-ventilatoren.com.
Commissioning software
online
Can be used with RLS 45 K room air control.
Connect at USB port (use USB (A)/mini USB
(B) cable). Download using QR code or from
www.maico-ventilatoren.com.
Accessory components
For more information about the final mounting
of
accessory components
Accessory
component supplement.
UK
Table of Contents
1 Scope of delivery ..................................29
2 Specialist installer qualification
..........29
3 Intended use ..........................................29
4 Safety instructions and warnings .......30
5 Requirements of the installation site ..32
6 Technical data .......................................32
7 Connection options ..............................33
7.1 Combinations with RLS 45 K ..............33
7.2 Combinations with RLS 45 O .............34
7.3 EnOcean combinations (radio) ...........34
8 Application example .............................35
9 Mounting ................................................36
9.1 Mounting information ..........................36
9.2 Unit structure and positioning ............37
9.3 Shortening extension duct
..................37
9.4 Gluing on sealing bands .....................38
9.5 Installing slide-in module
PPB 30 O/K/RC with extension duct
...........38
9.6 230 V electrical connection .................39
9.7 Connecting room air controls ..............40
9.8 Mounting radio switch (EnOcean) ......41
9.9
Installing PP 45 HYI humidity sensor in
RLS 45 O or RLS 45 K ...............................42
10 Commissioning .....................................43
10.1 Service mode – operation ...................43
10.2 Service menu for RLS 45 O ................ 44
10.3 Service menu for RLS 45 K ................. 46
10.4 Service menu for PPB 30 RC .............. 49
11 Spare parts ............................................51
APPENDIX
Installation dimensions ................................78
Wiring diagrams...........................................80
Acknowledgements:
© Maico Elektroapparate-Fabrik GmbH. Transla-
tion of the original German instructions. We cannot
be held responsible for mistakes or printing errors
and retain the right to make technical modifications
without giving prior notice. The brands, brand names
and protected trade marks that are referred to in this
document refer to their owners or their products.