TPS I and III for Eurosystem
D1 1004BA1-GB03
7
3 Operations
3.1 Introduction
Please also read chapter 4,
Eurosystem PC-Program
, in the operating manual for the testing
lane Eurosystem.
The second part of this chapter
describes the testing procedure of a speedometer test and
distance test
.
The screen pictures on the right-hand side show the screens which appear during
operation. The steps listed on the left provide the user with clear explanations of procedure.
The third part provide information about the operation of a TPS I test stand with self-contained
drive (Option). The fourth part describes the operation of the TPS III (motorcycle).
The storing and the reviewing of measurements is described in the operating manual for the
testing lane Eurosystem.
3.2 Testing
Procedure
In order to start the testing procedure, the
monitor must show the main menu.
The instruction line must show the following
message:
New test can begin ...
If this message does not appear press
<F8 NEW VEHICLE>.
Now the test lane is ready for a vehicle to be
driven on. When the vehicle drives onto the
individual equipment the corresponding test
screen is blended in.
Always pay attention to the
messages and instructions on the instruction line
during testing.
(in the description this is indicated by
Instruction text
).
The recorded measurement values are automatically taken over in the temporary memory and
remain there until they are stored in connection with customer/vehicle
or
until they are
overwritten when a new test is conducted.
The following guides the user through the automatic testing procedure step by step. Usage of
the individual screen elements and the keyboard has already been clearly explained. See the
following sections in the operating manual for the testing lane Eurosystem to refresh your
memory:
=> 4.1.3 Screen Design
=> 4.1.4 Keyboard Usage