Maguire Products S-BLENDER Supplimental Documentation Download Page 9

Maguire Products, Inc. 

 

 9  

Maguire S Blender

 

Re-Installation of the Weigh Bin Assembly 

 

1.  To re-install the Weigh Bin, hold the dump flap 

closed while guiding the weigh bin into the Frame 
Assembly.  Orient the Weigh Bin so that the Dump 
Valve air hose is to the left and closest to you.

 

 

 

 

  
NOTE:  When re-installing the weigh bin, be 
certain that the weigh bin is properly 
seated on both load cells and is behind the 
stop screw as pictured to the right.
 

 

 

 

When closing the front access panel, be 
sure to check the door hinge for any pellets 
or debris and clear any from the hinge are 
before closing the door.  Pellets and debris 
trapped in the hinge will cause it not to 
close properly.  Forcing it to close with 
pellets trapped in the hinge can damage 
the door.
 

 

 

2.  Close the Back Door Assembly and close the latch. 

 

 

 

 
 
 

Summary of Contents for S-BLENDER

Page 1: ...Maguire Products Inc 1 Maguire S Blender MAGUIRE PRODUCTS INC Weigh Scale Blender S BLENDER SUPPLIMENTAL DOCUMENTATION Copyright Maguire Products Inc 2007...

Page 2: ...Maguire Products Inc 2 Maguire S Blender...

Page 3: ...for your Maguire controller Maguire Products Inc accepts no responsibility or liability for damage or malfunction of the equipment arising from non observance of these operating instructions To avoid...

Page 4: ...g 6 Re Installation of the Mix Chamber and Mix Blade 7 Weigh Bin Assembly Removal Inspection Cleaning 8 Re Installation of the Weigh Bin Assembly 9 Sensor Adjustment 10 Weigh Bin Door Flow Control Adj...

Page 5: ...ance of a factory representative to ensure the unit is properly configured Features High Temperature Construction Capacity 700 1 000 lbs hr depending on configuration Multiple configurations available...

Page 6: ...Safety Interlock Switch 1 To open the Front Door Assembly un latch the upper latch and pull the upper half of the door from the Safety Interlock Switch Folding at the hinge lower the upper door so th...

Page 7: ...lide the Mix Chamber into the Frame Assembly Orient the Mix Chamber Dump port so that it is directly above the Mix Chamber Saddle The port will be closest to the Front Door Assembly 2 Insert the Mix B...

Page 8: ...he hinged Back Door Assembly down onto the Mix Motor 2 Detach the Dump Valve Air Line 3 Hold the Dump Valve closed while sliding the weigh Bin out of the Frame Assembly 4 Clean and inspect the Weigh B...

Page 9: ...alling the weigh bin be certain that the weigh bin is properly seated on both load cells and is behind the stop screw as pictured to the right When closing the front access panel be sure to check the...

Page 10: ...d always be on solid when dryer has power unless calibrating Yellow should be on when no material is present in the mix chamber and off when material is present in the mix chamber Red indicates a prob...

Page 11: ...Maguire Products Inc 11 Maguire S Blender Dimensional Drawings...

Page 12: ...is found on the identification plate YEAR The year Blender was manufactured MODEL See below for descriptions of each field in the model number S Special Market Blender Model Series 4 Series 400 Slide...

Page 13: ...9014 Tel 610 459 4300 Fax 610 459 2700 Email info maguire com Web www maguire com Maguire Europe Tame Park Tamworth Staffordshire B775DY UK Tel 44 1827 265 850 Fax 44 1827 265 855 Maguire Products Asi...

Reviews: