What To Do When the Recon Indicator Lights Up

4/23/97

The following flowchart and corrective actions provide a systematic approach of
isolating the node(s) that generate RECONs.  If after following these steps no
nodes have been isolated and RECONs continue, contact a MagneTe k
r e p r e s e n t a t i v e .

What To Do

When the

Recon Indicator

Lights Up

Are

Power

Supply LEDs 

‘ON’ and steady

(located on 
backplane)

?

Is

Recon

LED 
‘ON’

?

Are

there

any RED

Receive Activity

Indicator LEDs 

(CR1 - CR4)

‘ON’

?

If blinking: Ensure that the proper 

loading resistor assemblies are 
installed in the backplane of the 
chassis assembly.

For Hub Assemblies:  MagneTek 

P/N 05P00090-0397 (10 ohm, 5W) 
should be installed into J1, and 
MagneTek P/N 05P00090-0398 
(56 ohm, 5W) should be installed 
into J2.

For PLC gateway assemblies:

MagneTek P/N 05P00090-0398 

(56 ohm, 5W) should be installed 
into J2.

If ‘OFF’: Verify that 110 Vac power is 

applied to power supply (i.e. is switch 
ON, is incoming power hot, etc.).  
Verify fuses.  The unit includes two (2) 
fuses.  One fuse is located on the 
power supply board.  If needed, 
replace this fuse with a 5MF2A250V 
or equivalent.  The other fuse is 
located in the Input Power connector 
assembly, between Power Switch and 
IEC plug.  A spare fuse is located 
above the fuse holder.  If needed, 
replace this fuse with a T2AL250V 
or equivalent.

If ‘OFF’ and 110 Vac is present 
and fuses are not burnt:

The power supply is bad; so the 
chassis assembly must be replaced.

For Hub assemblies:  MagneTek 

P/N 05P00090-0268 (PC chassis, 
4 half slots, 65W P.S.).

For PLC gateway assemblies:  

MagneTek P/N 05P00090-0273 

(PC chassis, 3 half / 3 full slots, 

65W P.S.).

Yes

Yes

No

No

No

Yes

Is

there

more than

1 MicroTrac

LAN node

powered

up

?

No

Yes

This is good.
There are no
Recons on the
Network.

The ARCNET
Active Hub will
indicate a
RECON when
there are no
LAN segments
connected to
the Hub, or
when 1 LAN
segment with
only 1 node is
powered up.
These are
valid
conditions.

There must be
at least 2
nodes
powered up for
token passing
to occur.  If
only 1 node is
powered up,
there is no
node to pass
the token to,
so a RECON
will occur.

A

RD 90-279

© 1997  MagneTek, Inc.

97-04

Summary of Contents for 05P00090-279

Page 1: ...ARCNET Active Hub Part No 05P00090 0279 For use on MicroTrac Local Area Network RD 90 279 1997 MagneTek Inc 97 04...

Page 2: ...recording taping or information storage and retrieval systems without written permission of the publisher MicroTrac DSD PAC and MagneTek are trademarks of MagneTek Inc Revision History The following...

Page 3: ...Table of Contents 4 23 97 Table of Contents Page Warranty ii INTRODUCTION 1 INSTALLATION 3 LAN CABLING RULES AND GUIDELINES 4 MASTER SLAVE CONFIGURATION 6 OPERATION 8 RD 90 279 1997 MagneTek Inc 97 0...

Page 4: ...without its prior consent Products which the Company consents to have returned shall be shipped prepaid f o b the Company s factory The Company cannot assume responsibility or accept invoices for una...

Page 5: ...lers remote logic nodes remote computers etc The ARCNET Hub receives messages sent by any one transmitting node and relays the message to all other nodes on the network The ARCNET Hub has four ports E...

Page 6: ...INTRODUCTION 2 INTRODUCTION 4 23 97 RD 90 279 1997 MagneTek Inc 97 04...

Page 7: ...a star washer 6 Important Note Read LAN Cabling Rules and Guidelines The ARCNET Hub stand alone unit comes ready to be mounted on a panel It is recommended that the stand alone unit be firmly grounde...

Page 8: ...ts A maximum of eight 8 nodes can be connected to each Active Hub port Each LAN node is directly connected to the coaxial cable with a TEE connector MagneTek Part No 05P00034 0540 Both ends of the coa...

Page 9: ...etween nodes See Note below Node Terminators 93 Port ARCNET LAN SEGMENT See Note below for LAN cable length Note LAN cable length can be up to 900 feet for each of the Hub ports The minimum cable leng...

Page 10: ...s follows 1 Position jumpers of E4 in one of the Active Hubs as shown This will be the master Active Hub 2 Position jumpers of E4 in the other Active Hubs as shown These will be the slave Active Hubs...

Page 11: ...ble connector is used in J1 to daisy chain the master and slave Active Hubs Figure 3 Ribbon and Connectors for Master Slave Configuration 10 pin connector MagneTek Part No 05P00034 0321 10 pin ribbon...

Page 12: ...s all the active nodes on the network See What To Do When the Recon Indicator Lights Up The Recon yellow LED indicator shows the stability of the network This light is OFF when the system is operating...

Page 13: ...etc Verify fuses The unit includes two 2 fuses One fuse is located on the power supply board If needed replace this fuse with a 5MF2A250V or equivalent The other fuse is located in the Input Power co...

Page 14: ...n these LAN segments should be looked at next in order to isolate the trouble making node A Does Recon LED stay ON Yes No Go to next LAN segment Disconnect all LAN segments from Hub From first LAN seg...

Page 15: ...to the LAN segment watching the RECON indicator LED If it stays ON disconnect that node and move to the next node Note that it is normal for the RECON LED to turn on initially when a node is added how...

Page 16: ...Make sure system has a good grounding scheme Contact MagneTek for Grounding Practices publication Swap suspected bad hardware PCB with a known good hardware PCB Make sure ARCNET coaxial TEE connector...