background image

 

3

 
2-2.Operational guide 

1.Place the handle on the holder. 
2.Plug the power cord into the power socket of the unit. 
3.Supply power to the rework station. 
4.Select and mount appropriate nozzle. 
5.Set power switch to 

I

 position, the unit will start working. 

6.Set temperature as needed. 
7.Pick up the handle, the unit should start working immediately. Set 

appropriate air volume and start your work when temperature remains 
stable.  

8.Hot air gun must be put back on the holder whenever not used. Meanwhile, 

the hot air will be cut off and cold air starts to cool the heating element 
automatically. The unit will be in idle status with temperature below 100

9.Disconnect the power cord when not in use for a long time. 
* Try to use lower temperature and large hot air volume. Doing so will 
increase heating element life and ensure the safety of IC

s.   

3.Temeperature Setting 

1.The set temperature will be displayed while the temperature knob is turned. 
2.Clockwise turn of the temperature knob will raise the temperature while  

counterclockwise lowers it. Actual temperature or 

---

 will be displayed   

and the unit enters standby mode after the set temperature displays for two 
seconds. 

Note: 

1. 

---

 implies temperature at air outlet is below 100

.When the handle 

is on the holder, the unit is in standby mode. 

2. 

S-E

 implies there is something wrong with the sensor. 

The sensor needs to be replaced (heating element and sensor assembly). 

3. If the displayed temperature is less than 50

  and can be raised anymore, 

it means the heating element is probably damaged and replacement is needed 
(heating material and sensor assembly). 

 

4.Safety Considerations 

Please read this manual carefully before operating the device. This rework station is equipped 
with a 3-wires grounding plug and must be plugged into a 3-terminal power outlet. Do not 

Reviews: