
BOOM-TO-MAST PLATE
WITH BOOM ATTACHED
2” U-BOLTS
SADDLES
NUTS
LOCKWASHER
O.D. MAST
(CUSTOMER FURNISHED)
SECURE WITH THESE NUTS
AFTER TENSIONING
TENSION GUYS WITH THES
GUY CABLE
CUT OFF EXCESS
WRAP FIVE OR MORE TIMES
EGG INSULATOR (E
VERTICAL GUY SUPPORT
FIGURE 4
GUY ASSEMBLY
Cut four pieces of guy cable
(30”) and two pieces
(82”). Assemble
hex nut
(NO 1) onto each
(N18). Turn
all the way to the eye; as far
will go with light pressure
only. These will be used to secure the
after guy tensioning.
Install
into the top holes of the vertical guy support
one eye each direction. Thread
a hex nut about six turns onto each
Install a egg insulator
on one end of each
(30”) guy cable and wrap it five or more times.
Take two of these cables and install one on each
leaving
(12”) between the egg insulator and
the
wrap it five or more times and cut off the excess. Take the other two cables with insulators and
wrap each around the boom just in front of the clamp as shown in Figure 4A. Wrap and cut off excess.
Using the remaining two pieces of cable, take one end and thread it through the top egg insulator.
Wrap and cut off excess. Thread the other end through the lower insulator and pull tight enough to remove
slack only. Wrap and cut off excess.
Tension guys by tightening the nuts on the ends of the eyebolts. Secure with the nuts on the opposite
end near the eye.
Line the elements up with the use of a level or any other workable method. Double check the spacing
dimensions and make sure the elements are centered in the boom-to-element clamps. Tighten all hardware
taking care to line the elements up with the use of a level. Check your measurements and make sure the
elements are centered on the boom.
5