background image

FIGURE 3B

ELEMENT MOUNTING

Mark each element at the center and be sure that the boom-to-element mounts 

 are centered on the

elements before tightening hardware. Starting 1” from the director end of the boom, mount each element using 2” 
bolts, saddles, boom-to-element mounts and hardware as shown. Refer to Figures 1   3B for element spacing
dimensions. (At this point go back and complete the guy cable assembly.)

FIGURE 3C

REFLECTOR ASSEMBLY

The length of the reflector wire is very critical. It must be the correct length to operate correctly. Take the wire

 and uncoil it making sure that there are no kinks; secure it to a nail. Pull the wire until it stretches an inch or

so. The easy way to get the correct length for the reflector loop is as follows:

1. Drive 2 nails in a board or fence 

 the length of the loop apart --which is 

 

 between them.

2. Stretch the wire around the nails by hand as tightly as possible and splice ends together. Solder the splice. Remove
one nail and remove the loop. Cut any excess wire off.
3. Loosely assemble the machine screws (S2 

 flatwashers 

 lo&washers 

 and hex nuts

 onto the lugs of the fiberglass arms, adjusting the length as shown.

4. Tighten 3 of the 4 clamps that hold the fiberglass rods.
5. Install the wire as shown.
6. Tighten the wire by pulling the fourth fiberglass rod until the wire is the same tightness as it was
around the nails. The wire loop is now the correct length. Note the total length of the loop is critical, and also is the
length of each side. REMEMBER: Reflector dimensions are only preliminary. Change to get equal sides of 9’ 
4” . Fiberglass length is not critical, however the equal wire length of 9’ 

 is very critical.

7. Take the remaining reflector wire and thread it through the drill holes in the four spreaders pulling stung and splicing
each piece. This completes the reflector assembly.

FIGURE 4

GAMMA MATCH MOUNTING

Mount the gamma match (GO 

 to the horizontal driven element, using the gamma strap 

 

 and

attaching hardware as shown. Attach your 52 ohm coaxial cable to the connector (S42) and dress along boom and down
the mast.

ADJUSTING STANDING WAVE RATIO

Refer to Figure 4. The dimensions given are approximate and should be used as a starting point. The following

instructions cover the adjustment of one gamma match. To adjust the second gamma match, simply repeat this
procedure.

The gamma match has 2 adjustments. First is the capacitor adjust and the second is the slider adjust. Connect

a S W .R bridge to the coax between your transmitter and the antenna and check the S .W 

If adjustment is required

loosen the clamp on the gamma match and the screws holding the slider (Gamma Straps 

Next move the capacitor

adjustment first in one direction then the other until a minimum S.W.R. reading is obtained. If S.W.R. is not yet
satisfactory, move the slider out 2” away from the boom.

 reading has gone up, move the slider back to the original

position and then 2” toward the boom. Now readjust the capacitor for minimum S.W.R. you should now be able to
determine which direction to move the slider. Repeat the above procedure moving the slider in smaller increments until
a satisfactory S.W.R. reading is obtained. Tighten all hardware. Disconnect the S.W.R. bridge and reconnect your
coaxial cable.
the screws. Bring the ends together 

and lineup the marks that are 2” from each end. Now twist the loose

ends together and solder as shown. Adjust each fiberglass arm so that the reflector wire becomes taut and
each leg of the square is 9’ -4 

 and tighten the clamps. A slight natural bowing of the fiberglass is normal.

This will not affect normal operation of the antenna as long as the lengths of wire are correct.

 6

Summary of Contents for Flatsider 6

Page 1: ...F L A T S I D E R6 6E L E ME N T 1 1 ME T E R MO N O B A N D E R ...

Page 2: ...ated saddles _____ BAG 3 EG2 4 egg insulators _____ N18 2 5 16 eye bolts w 2 NO1 each _____ PL1 2 3 8 plastic caps black _____ PL2 10 437 plastic caps black _____ PL5 1 2 plastic cap black _____ PL5R 1 2 plastic cap red _____ Z02P 2 4 gamma straps _____ N11 19 10 24 square nuts _____ S21 19 10 24 machine screws _____ W58P 14 5 8 extruded aluminum clamps _____ N26 4 No 10 flat washers _____ 3 fiber...

Page 3: ...A MATCH SEE FIG 4 1 st DIRECTOR 2nd DIRECTOR J 16 6 A 3rd DIRECTOR 16 6 A PLSR RED PLASTIC CAF 4th DIRECTOR 16 2 A NOTES OR DETAILS OF BOOM GUY ASSEMBLY AND MAST MOUNTING SEE FIG 2 AFOR DETAILS OF ELEMENT ASSEMBLY AND MOUNTING SEE FIG 3 GENERAL ASSEMBLY D FLATSTDER 6 2 ...

Page 4: ...the outside hex nuts only a couple of turns onto the ends of the eyebolts and leave the inside nuts loose so that you can take the slack out of the cable later Now take two 2 foot lengths and attach an egg insulator to one end of each in the same manner At this point it is necessary to go on to element assembly and mounting before completing the guy cable assembly Take both 2 foot cable lengths wi...

Page 5: ...e drill holes in the four spreaders pulling stung and splicing each piece This completes the reflector assembly FIGURE 4 GAMMA MATCH MOUNTING Mount the gamma match GO 1P to the horizontal driven element using the gamma strap ZO2P ZOSP and attaching hardware as shown Attach your 52 ohm coaxial cable to the connector S42 and dress along boom and down the mast ADJUSTING STANDING WAVE RATIO Refer to F...

Page 6: ... R C O U P L E R I I VO3P V E R T I C A L G U Y S U P P P P O R T 1 I EGl INSULATOR I I I I I I I I I I I I O O M W I T H B O O M T O i I M A S T P L A T E A T T A C H I i I I I I I I I I I I I 1 I I I I I 1 I I I I I I I I I I I N16 NO1 I 4 EYEBOLT I 5 16 HEXNUTS I WD4P I G U Y C A B L I I I a I I i LHORIZONTAL I I B O O M T O I E L E M E N T M O U N I I N S U L A T O R I LUOI SO1 NOl N 0 2 I 2 U...

Page 7: ... SADDLE 5 16 NUTS t W A S H E R S u I VERTICAL E L E M E N T I I l5 16 NUTS W A S H E R S I I HORIZON I AL ELEMENT MOUNTING ELEMENT SPACING I I VERTICAL ELEMENT MOUNTING FIGURE 38 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ IPlease read the Assembly and Troubleshooting Tips at the 1 I I end of this instruction booklet before assembling elements I I I I I FIBERGLASS ARM I I I I S21 Nil Nl I I u 24 x l Z I F L ...

Page 8: ...ND GO BACK TO THE CAPACITOR HORIZONTAL SLIDER ADJUST 23 VERTICAL SLIDER ADJUST 17 LK WSHR SQ NUT HORIZONTAL DRIVEN I I ELEMENT r ZO2P ZO8P GAMMA STRAPS INSTALL FLUSH AGAINST BOOM TO ELEMENT MOUNT I 3 8 24 N U T 3 8 S T A R W S H R xi I 7521 Nil N12 sy HER 3 8 PLASTIC SHOULDER W A S H E R GAMMA STRAPS SLIDER C U S T O M E R FURNISHEiI COAXIAL CABLE HORIZONTAL CAPACITOR ADJUSTMENT 1 VERTICAL CAPACIT...

Page 9: ... e m b l y C o n t a c t y o u r l o c a l i n s t a l l e r i f c o n s u l t a t i o n o r a s s i s t a n c e i s r e q u i r e d A l l t o w e r a n d a n t e n n a i n s t a l l a t i o n s s h o u l d b e t h r o u g h l y i n s p e c t e d a t l e a s t t w i c e a y e a r b y q u a l i f i e d e x p e r i e n c e d a n d t r a i n e d p e r s o n n e l t o i n s u r e p r o p e r p e r f o...

Reviews: