background image

Please 

read the Assembly and Troubleshooting Tips 

at the

end of this instruction booklet before assembling elements.

DIMENSION

 ELEMENT

A

B

 

 

 1

[CLAMP WITH 

 

DRIVEN

209”

68 

 a 

  N U T

DIRECTOR

204” 66”

REFLECTOR 

161 

44 

FIBERGLASS

R

EFLECTOR 

 ARE ONLY PRELIMINARY

.

C

HANCE TO 

 EQUAL 

 OF 

9’ 6”. 

LENGTH 

 

LENGTH 

OF 

 6” 

IS 

 CRITICAL.

 

TUBING

 O.D.

TUBING

ELEMEN   ASSEMBLY (FIGURE 

 

TUBING

BOOM-TO-

\

6

ELEMENT

MOUNT

MOUNT

 0 

TUBING

 

  N O 1  

 

 u-BOL   a 

HORIZONTAL

 

 

 

 NUTS a WASHERS

 

 U-BOLT a SADDLE

U

 NUTS 8 WASHFRS

HORIZONTAL ELEMENT MOUNTING

ELEMENT SPACING

VERTICAL ELEMENT MOUNTING

(FIGURE 

The length of the reflector wire is very critical. It must be the correct length to
operate correctly. Take the wire 

 and uncoil it making sure that there are no

kinks; secure it to a nail. Pull the wire until it stretches an inch or so. The easy way
to get the correct 

 the reflector loop is as follows

1. Drive  nails in a board or fence 

 the length of the loop apart --which is 228”

 between them.

2. Stretch the wire 

 nails by hand as tightly as possible and splice ends

together. Solder the splice. Remove one nail

 

 N12, 

and remove the loop. Cut any excess wire off.
3. Loosely assemble the machine screws 

flatwashers 

 lockwashers 

 and hex

nuts 

(N06) onto the lugs of the fiberglass arms,

adjusting the length as shown.

4. Tighten 3 of the 4 clamps that hold the

VERY

 

   

6. Tighten the wire by pulling the fourth

 

COMET

fiberglass rod until the wire is the same tightness as it was around the nails. The wire
loop is now the correct length. 

R

EFLECTOR DIMENSIONS ARE ONLY PRELIMINARY

. C

H A N G E

TO GET EQUAL SIDES 

 9’ 6”.

F

I B E R G L A S S   L E N G T H   I S   N O T   C R I T I C A L

H O W E V E R

T H E   E Q U A L

 

 OF 

9’ 6” 

IS VWY CRITICAL.

4

Summary of Contents for Comet

Page 1: ...h a r l e s E l e c t r o n i c s L L C 3 0 2S E a s t S t r e e t Mt C a r r o l l I L6 1 0 5 3 C o p y r i g h t 2 0 0 9C h a r l e s E l e c t r o n i c s L L C A l l R i g h t s R e s e r v e d w...

Page 2: ...LEMENT MOUNT ____ W58P 12 5 8 ALUMINUM CLAMPS ____ PL2 8 437 PLASTIC CAPS BLACK ____ PL4R 1 1 PLASTIC CAP RED ____ PL4B 1 1 PLASTIC CAP BLACK ____ S21 13 10 24 MACHINE SCREWS ____ N11 13 10 24 SQUARE...

Page 3: ...ightened securely and then coated with silicon rubber sealant or similar compound to prevent loosing from wind vibration Take care to locate all parts accurately per dimensions given Complete each ste...

Page 4: ...MAST CUSTOMER FURNISHED To assemble the boom slide the swaged ends of the boom section T59P 0 152m into the boom section T28 Mount the boom to mast plate PO3P to the boom using the 1 l 2 U bolts 1 l 2...

Page 5: ...e WO4P and uncoil it making sure that there are no kinks secure it to a nail Pull the wire until it stretches an inch or so The easy way to get the correct lengc for the reflector loop is as follows 1...

Page 6: ...ARY MOVE THE SLIDER AND GO BACK TO THE CAPACITOR ZOBP GAMMA S T R A P S I N S T A L L F L U S H A G A I N S T B O O M T O E L E M E N T M O U N T E L E M E N T 318 S T A R W A S H E R F L A T W A S H...

Page 7: ...a c t y o u r l o c a l i n s t a l l e r i f c o n s u l t a t i o n o r a s s i s t a n c e i s r e q u i r e d A l l t o w e r a n d a n t e n n a i n s t a l l a t i o n s s h o u l d b e t h o r...

Reviews: