 CAUTION 

Important Information 

Operating Principle 

Installation Procedure 

WARNING 

Before use, confirm the fluid to be used is 
compatible  with  the  meter.  Refer  to Industry 
fluid  compatibility  charts  or consult  your  local 
representative  for advice. 

 
To prevent damage from dirt or foreign matter  it  is  
recommended  that  a  Y or Basket   type   60   mesh   
strainer   be installed  as  close  as  possible  to  the 
inlet  side  of  the  meter.  Contact  your local 
representative for advice. 

 
 
 
 

When  a  strainer  is  installed  it should  be  
regularly  inspected  and cleaned.  Failure  to  
keep  the  strainer clean  will  dramatically  effect  
flow meter performance. 

 
 
 
 

To prevent damage caused by air purge slowly 
fill the meter with fluid.  To reduce pressure build 
up turn off the pump at the end of each day. 

 
Maintenance can be carried out to the liquid  crystal  
displays  and  pulse  units without removing or 
isolating the meter from  the  line.  When  
maintenance  to any other part of the meter is 
required, the meter must be isolated and the line 
pressure reduced. 
 
The  reed  switch  pulse  unit  can  cause inaccurate 
rate counts when used with high speed counters. It is 
advised that a debounce circuit be used. Contact 

 CAUTION 

 CAUTION 

When  fluid  passes  through  the  meter the  rotors  
turn,  as  shown  below.  The magnets which are  
located in the rotors will pass across the pulser  
circuit board (containing either Reed switches or Hall 
Effect sensors). A signal is generated which is then 
sent by the Pulse Circuit Board (PCB) to the relevant 
LC display or receiving instrument.. 

1) It is recommended that when setting up pipe work 
  for meter installations a bypass line be included in 
  the design. This provides the facility for a meter to 
  be removed for maintenance without interrupting 
  production. (see figure above) 
 
2) Use   thread   sealant   on   all   pipe threads. 
 
3) For  pump  applications  ensure  pipe work  has  
  the  appropriate  working pressure rating to match 
  the pressure output   of   the   pump.   See   Meter 
  Specifications   section   for   further details. 
 
4) Install  a  wire  mesh  strainer, Y  or basket  type  
  60  mesh (250 micron),  as  close  as possible to 
  the inlet side of the meter. 
 
5) Ensure  that  the  meter  is  installed  so that  the  
  flow  of  the  liquid  is  in  the direction of the 
  arrows embossed on the meter body. 
 
6) The  meter  can  be  installed  in  any 
  orientation as long as the meter 
  shafts are  in  a  horizontal  plane.  
  (Refer to figures to the right  for  
  correct  installation)  The register  
  assembly  may  be  orientated to suit 
  the individual. 
 

Note:  Incorrect  installation  can  

 

cause premature wear of meter 

 

components. 

 
7) Do not  over tighten meter connections. Note:  
 

Incorrect  installation  can  cause premature wear 

 

of meter components. 

 
8) It  is  important  that  after  initial installation  you  
  fill  the  line  slowly, high  speed  air  purge  could  
  cause damage to the rotors. 
 
9) Test the system for leaks. 
 
10) Check the strainer for swarf or foreign  material,  
 

after the first 200 litres check periodically, 

 

particularly if  the flow rate decreases. 

Summary of Contents for 050

Page 1: ...and operating instructions for meters with Mechanical Displays If you need further assistance contact your local representative or distributor for advice This Flow Meter has incorporated the oval roto...

Page 2: ...switches or Hall Effect sensors A signal is generated which is then sent by the Pulse Circuit Board PCB to the relevant LC display or receiving instrument 1 It is recommended that when setting up pip...

Page 3: ...when inserting the rotors the smooth side of the rotor is the magnet side There is no difference between rotor one or rotor two 3 Replace the rotors Item 3 onto the shafts at 90 degrees to each other...

Page 4: ...d maximum flow rates b Bleed air from system c Check meter body and rotors Replace as required Refer to installation instructions Fluid flows but no reading on meter a Bevel gear is loose on shaft b R...

Page 5: ...Description 1 Meter Body 2 Meter Cap 0 Ring 3 Rotor Set 4 Adaptor Bolts 5 Flanged Process Connection 6 Adaptor O Rings 7 Threaded Process Connection 8 Meter Cap 9 Gear Set 10 Meter Cap Screws 11 Cover...

Page 6: ...g Procedure 1 Determine what type of Spare Parts Kit is required e g Rotor Kit 2 Use the Coding Sequence to construct a part number according to the meter type Flange Seal Kit FSKit FSKit Type Size F...

Page 7: ...umber Order Number Components Qty Items Cover Plate O Ring 1 e g SKit F050 M 11 Meter Body O Ring 1 2 Order Number Components Qty Items Complete Rotor Assembly 1 set e g RKit F050 SM 3 Meter Body O Ri...

Page 8: ...de POM Acetal PTFE Polytetrafluoroethylene FFKM Perfluoro Elastomer Component Type F Type S Type M Meter Body Al Al SS Rotor Shaft SS SS SS Rotors Standard PPS SS PPS High Temp SS High Viscosity PPS S...

Page 9: ...Page 9 of 14 Pressure Drop v s Viscosity 100 50 25 10 5 100 50...

Page 10: ...Page 10 of 14 Meter Dimensions...

Page 11: ...Page 11 of 14 Air Eliminator Strainer Combination 2 Flange 2 Threaded Connection...

Page 12: ...Page 12 of 14 Notes...

Page 13: ...ies of purchase receipts and or other supporting documents and at the purchaser s own cost returning the defective product to the nearest authorised Macnaught service centre Subject to compliance by t...

Page 14: ...Page 14 of 14...

Reviews: