Page | 8 
 

Maintenance 
 
 
 

 

 
 

Check main belt tension: 

 
 
 
Maintaining the proper belt tension is 
essential to good machine performance and 
service life. Operating the machine with an 
improper belt tension can damage machine 
components. 
 
 

Check belt tension whilst power is off. 
 

1.

 

Belt tension should only be adjusted 
when the belt touches the 
underside of the main frame. 

2.

 

To adjust, loosen the two 10mm 
nuts under the bolt covers at base of 
machine. 

3.

 

Turn the long 8mm bolt clockwise, 
repeat on both sides of conveyor 
evenly until correct tension is 
achieved. 

4.

 

Tighten two 10mm nuts. 

 
 
____________________________________ 
 

 
 
Observe and Obey: 
 

Only routine maintenance items specified 
in this manual shall be performed by the 
operator. 
 
Scheduled maintenance inspections shall 
be completed by qualified service 
technicians, according to the 
manufacturer's specifications and the 
requirements specified in the 
responsibilities manual. 
 
 
 
 

Maintenance symbols legend: 
 
 
 
 

The following symbols have been used in 
this manual to help communicate the 
intent of the instructions. When one or 
more of the symbols appear at the 
beginning of a maintenance procedure, it 
conveys the meaning below. 
 
 
 
Indicates tools will be needed to carry out 
this operation. 

Scheduled Maintenance 
 

Maintenance performed quarterly and 
annually must be completed by a person 
trained and qualified to perform 
maintenance on this machine according 
to the procedures found in the service 
manual for this machine. 
 
Machines that have been out of service 
for more than three months must 
receive the quarterly inspection before 
they are put back into service. 
 
_________________________________ 

Summary of Contents for UL50

Page 1: ...Operators manual UL50 Including SN variant...

Page 2: ...now and understand the safety rules before going on to the next section 2 Always perform a pre operation inspection 3 Always perform function tests prior to use 4 Inspect the workplace 5 Only use the...

Page 3: ...chine This manual should be considered a permanent part of your machine and should remain with the machine at all times If you have any questions please call Mace Industries Contents Safety 4 Pre oper...

Page 4: ...ladders or scaffolds against any part of this machine Do not use the machine on a moving or mobile surface or vehicle Do not ride on machine Do not alter or disable limit switches or remote handset Wh...

Page 5: ...zard Use common sense and planning when installing and operating the machine Keep hands and limbs away from moving belt Always wear correct PPE Damaged Machine Hazards Do not use a damaged or malfunct...

Page 6: ...machine must never be used If damage or any variation from factory delivered condition is discovered the machine must be tagged and removed from service Repairs to the machine may only be made by a q...

Page 7: ...teners and pins are in place and properly tightened Be sure the main belt is properly tensioned and in good condition Be sure the belt carriers are secure and in good condition Check the following com...

Page 8: ...r Scheduled maintenance inspections shall be completed by qualified service technicians according to the manufacturer s specifications and the requirements specified in the responsibilities manual Mai...

Page 9: ...service technician according to the manufacturer s specifications After repairs are completed the operator must perform a pre operation inspection and function tests again before putting the machine...

Page 10: ...ress FWD 3 Belt will move forward 4 Press STOP 2 Belt will stop 5 Press REV 1 Belt will move in reverse 6 Press STOP 2 Belt will stop 7 Press FWD 3 Belt will move forward 8 Press EMERGENCY STOP 4 Belt...

Page 11: ...as it was intended Fundamentals The workplace inspection helps the operator determine if the workplace is suitable for safe machine operation It should be performed by the operator prior to using the...

Page 12: ...ected to use a machine at different times in the same work shift they must all be qualified operators and are all expected to follow all safety rules and instructions in the operator s safety and resp...

Page 13: ...3 Place item onto conveyor belt Ensure correct manual handling technique is followed If you think the item was misplaced stop conveyor and adjust item 4 To remove an item at the end of the conveyor P...

Page 14: ...dustrial Estate Corby Northamptonshire NN17 4JN 01536 206600 Model UL 500 Machine weight Minimum 65kg Maximum payload overall 100kg Maximum single point payload 50kg Belt speed Adjustable Maximum angl...

Reviews: