
Page | 31
10.
Once the power is linked, begin the process of linking the controls.
Using the control linking lead supplied, plug the linking lead into the control
output socket on the end of the conveyor then into the control input socket of the
next conveyor.
Ensure the control lead cannot get tangled in the moving belt.
Do not connect the control linking leads whilst the conveyor is in use.
Summary of Contents for SHIFTA
Page 10: ...Page 10 CONTROLS...