4.4 Roll Timing
For proper conditioning, the rolls must be properly timed. Each steel bar on one of the rolls should be centered
between two bars of the other roll. The factory setting should be suitable for most crop conditions.
IMPORTANT:
Roll timing is especially critical when roll gap is decreased because the bars can contact each other if the
timing is wrong.
4.4.1 Checking Roll Timing
DANGER
To avoid bodily injury or death from unexpected startup of the machine, always stop the engine and remove
the key from the ignition before leaving the operator’s seat for any reason.
1. Lower the header fully.
2. Stop the engine and remove the key.
3. Open the driveshield. Refer to
4. Loosen nuts (B) and slide conditioner shield (A) up
to remove.
Figure 4.7: Conditioner Shield
5. Measure the roll timing distance (B) at each end
of the rolls. Each steel bar on one roll should be
centered between two bars of the other roll so that the
distance (B) is approximately equal on both sides of
the bar.
6. If adjustment is required, refer to
NOTE:
Roll spacing not to scale in illustration.
7. Close the driveshield. Refer to
Figure 4.8: Conditioner Roll Timing
A - Center Roll Bars
B - Roll Timing Distance
147757
79
Revision B
Summary of Contents for R85
Page 2: ...R85 Rotary Disc 13 Foot Header for Self Propelled Windrower Published June 2016 ...
Page 3: ...Declaration of Conformity Figure 1 EC Declaration of Conformity Page 1 147757 i Revision B ...
Page 4: ...Figure 2 EC Declaration of Conformity Page 2 147757 ii Revision B ...
Page 21: ...SAFETY Figure 1 17 Safety Decal Locations A MD 184385 147757 9 Revision B ...
Page 28: ......
Page 34: ......
Page 110: ......
Page 160: ......
Page 168: ......
Page 187: ......