![background image](http://html1.mh-extra.com/html/macdon/m150-2009/m150-2009_setup-instruction_3220434006.webp)
SET-UP INSTRUCTIONS
Form 169216
January 2009
4
5. Remove hose (E) from cooler by-pass relief
valve next to oil filter and connect to fitting
(B) on DWA drive block. The other end of
hose is connected to the super charge
pump.
NOTE:
Access to hose (E) can be
from underneath tractor or by raising tractor
hood and working from the left hand
platform.
6. Install the other end of hose (D) to cooler by-
pass relief valve next to oil filter. This is
where hose (E) was disconnected.
Platform Rail Installation
7. Remove right hand steps (S) from platform
by loosening two top bolts (A) and removing
two bottom bolts (B). Lift steps to detach at
top keyhole slots (A). Retain bolts for next
step.
8. Install rail weldment (C) to right hand
platform as follows: Hang rail weldment (C)
by engaging keyhole slots on top bolts (A).
Install two bottom bolts (B) and tighten all
four bolts.
E
B
D
D
E
A
S
B
C
A
B
Summary of Contents for M150 2009
Page 2: ...MACDON DOUBLE WINDROW ATTACHMENT ...
Page 26: ...MAINTENANCE SERVICE Form 169216 January 2009 24 Hydraulic Schematic ...
Page 30: ...Form 169216 January 2009 28 DECK DRAPER ROLLERS Illustration 2 ...
Page 32: ...Form 169216 January 2009 30 DECK SUPPORTS LINKAGE Illustration 1 ...
Page 34: ...Form 169216 January 2009 32 DECK SUPPORTS LINKAGE Illustration 2 ...
Page 36: ...Form 169216 January 2009 34 HYDRAULICS IN CAB ELECTRICAL ...
Page 38: ...Form 169216 January 2009 36 HYDRAULIC SERVICE COMPONENTS ...