214325
45
Revision A
Figure 3.67: Harness Routing
16. Route harness (A) under cab (along existing hoses) to
left of feeder house, under hose shield (C), and to
multicoupler (B).
17. Secure harness to hoses with cable ties as required.
Installing Reel Fore-Aft/Header Tilt Switch: 50, 60, and 70 Series Combines
The switch allows the combine Operator to select either REEL FORE-AFT or HEADER TILT mode.
WARNING
To avoid bodily injury or death from unexpected start-up or fall of raised machine, always stop engine,
remove key, and engage safety props before going under machine for any reason.
This procedure is applicable
ONLY
to John Deere 50, 60, and 70 Series combines.
IMPORTANT:
To prevent damage to electronic components, disconnect the positive cable from the combine battery before
connecting harness to combine connectors.
1.
Lay the switch harness along the route from front of the feeder house to the auxiliary power supply in the cab
as per these instructions. Ensure the switch harness will attach to selector valve wiring (with header tilted
forward) and that the feeder house can be fully lowered with adequate slack in the harness.
50 series harness routing
Figure 3.68: 50 Series Harness Routing
2.
Tie the switch harness (A) to the main harness on the
left side of the feeder house with cable ties provided.
Leave 250 mm (10 in.) extending past the end of main
harness (B).
60/70 series harness routing