
214328
82
Revision A
Figure 6.2: Knife Drive Box
3.
Run header for an additional 10 minutes at operating
speed, watching and listening
FROM THE
OPERATOR
’
S SEAT
for binding or interfering parts.
4.
Have someone check rpm of knife drive box pulley (A)
with a hand-held tachometer.
5.
Compare actual pulley rpm with values in following chart. Refer to SP Windrower Operator
’
s Manual if
adjustments are required.
Table 6.1 Knife Speed Guidelines
Header Size (ft.)
Recommended Knife Speed Range (rpm)
Single Knife
Double Knife
15 ft.
—
750
–
950
20, 25 ft.
600
–
700
700
–
850
30 ft.
600
–
700
600
–
800
35 ft.
550
–
650
600
–
700
40 ft.
525
–
600
550
–
700
6.
Shut down windrower and remove key.
7.
Perform post run-up check as listed on the Predelivery Checklist. Refer to yellow sheet
attached to this instruction.
6.1
Performing Post Run-Up Adjustments
Perform post run-up check as listed on Predelivery Checklist. Refer to yellow sheet
Predelivery Checklist, page 99
attached to this instruction to ensure machine is field-ready.
WARNING
To avoid bodily injury or death from unexpected startup of machine, always stop engine and remove key
before making adjustments to machine.
Some adjustments may be necessary after run-up. Refer to
6.1.1 Adjusting Knife and Guards, page 82
6.1.1
Adjusting Knife and Guards
WARNING
To avoid bodily injury or death from unexpected startup of machine, always stop engine and remove key
before making adjustments to machine.
Summary of Contents for D65
Page 2: ...D65 Draper Header for Windrowers Published June 2017...
Page 4: ...214328 ii Revision A...
Page 6: ......
Page 24: ......
Page 42: ......
Page 56: ......
Page 58: ...214328 50 Revision A Figure 5 2 Outer Skid Shoe PERFORMING PREDELIVERY CHECKS...
Page 92: ......
Page 109: ......