5.5
Checking Header Levelling
Windrower linkages are factory-set to provide the proper level for the header and should not normally require
adjustment.
If the header is
NOT
level, perform the following checks prior to adjusting the levelling linkages. The float springs
are
NOT
used to level the header.
1.
Park windrower on level ground.
2.
Check windrower tire pressures.
3.
Raise header fully and hold momentarily to allow lift cylinders to rephase.
4.
Stop engine and remove key.
CAUTION
To avoid bodily injury or death from unexpected startup of machine, always stop engine and remove key
from ignition before leaving operator’s seat for any reason.
5.
Place float pins (A) in locked out position.
CAUTION
Check to be sure all bystanders have cleared the area.
Figure 5.7: Float Pin
6.
Start engine and set header approximately 150 mm
(6 in.) off ground. Check that member (A) is against
link (B).
7.
Note high and low end of header.
Figure 5.8: Member and Link
147913
81
Revision A
Summary of Contents for A40-D
Page 2: ...A40 D Self Propelled Windrower Auger Header Published May 2016 ...
Page 76: ......
Page 100: ......
Page 119: ......