
PRE-DELIVERY CHECKS
Form 169078
Revision C
51
I. RUN-UP THE HEADER
CAUTION
Never start or move the machine until you
are sure all bystanders have cleared the
area.
CAUTION
Clear the area of other persons, pets etc.
Keep children away from machinery. Walk
around the machine to be sure no one is
under, on or close to it.
CAUTION
Before investigating an unusual sound or
attempting to correct a problem, shut off
engine, engage parking brake and remove
key.
Refer to your M Series Unloading and Assembly
Instructions, or your M Series Self-Propelled
Windrower Operator’s Manual.
a. Operate the machine slowly for 5 minutes,
watching and listening FROM THE
WINDROWER SEAT for binding or interfering
parts.
b. Run the machine for 15 minutes at maximum
engine operating rpm and perform the run-up
check as listed on the "Pre-Delivery Checklist"
(yellow sheet attached to this instruction) to
ensure the machine is field-ready.
c. Check actual speed of wobble box pulley using
a hand-held optical tachometer during run-up.
Speed should be 775 rpm for A30-S,
and 950 rpm for A30-D and A40-D with the
engine at 2600 rpm (M100), 2300 rpm (M150,
M200, M205).
d. If speed is incorrect, check the header ID in the
windrower display module, or the header drive
pump may require adjusting.
Summary of Contents for A30-D
Page 53: ...NOTES Form 169078 Revision C 53 ...
Page 55: ......